Old 10-25-2013, 08:34 AM   #1741
TurnedTheCorner
Lifetime Suspension
 
TurnedTheCorner's Avatar
 
Join Date: Nov 2003
Exp:
Default

Quote:
Originally Posted by Slava View Post
Being the eternal optimist you seem to be, I suppose you could hope for an early death!
Way ahead of you.
TurnedTheCorner is offline   Reply With Quote
The Following User Says Thank You to TurnedTheCorner For This Useful Post:
Old 10-25-2013, 08:35 AM   #1742
MacDaddy77
First Line Centre
 
MacDaddy77's Avatar
 
Join Date: Sep 2006
Exp:
Default

I think there will be construction by next fall but probably won't be complete for 3-4 years so both 1&2
MacDaddy77 is offline   Reply With Quote
Old 10-25-2013, 08:36 AM   #1743
Fozzie_DeBear
Wucka Wocka Wacka
 
Fozzie_DeBear's Avatar
 
Join Date: Nov 2003
Location: East of the Rockies, West of the Rest
Exp:
Default

Has the official route for the SW leg been determined?
__________________
"WHAT HAVE WE EVER DONE TO DESERVE THIS??? WHAT IS WRONG WITH US????" -Oiler Fan

"It was a debacle of monumental proportions." -MacT
Fozzie_DeBear is offline   Reply With Quote
Old 10-25-2013, 08:42 AM   #1744
Acey
Franchise Player
 
Join Date: Nov 2009
Location: Calgary
Exp:
Default

Quote:
Originally Posted by Fozzie_DeBear View Post
Has the official route for the SW leg been determined?
No.
Acey is offline   Reply With Quote
The Following User Says Thank You to Acey For This Useful Post:
Old 10-25-2013, 09:19 AM   #1745
V
Franchise Player
 
V's Avatar
 
Join Date: Feb 2005
Exp:
Default

Quote:
Originally Posted by Regulator75 View Post
We should start a poll.

When do you think the SW ring road will be completed.

1-3 years
4-7 years
7-10 years
10-20 years
Never.
I'd bet 7-10 years. It's going to be a couple of years before they're even done all of the archeological work.

Has anything more than a conceptual design been completed?
V is offline   Reply With Quote
Old 10-25-2013, 09:25 AM   #1746
Acey
Franchise Player
 
Join Date: Nov 2009
Location: Calgary
Exp:
Default

I'll update my "no" to "yes plans are drawn up but are subject to change." There were changes made from the planning studies to the final design of the SE.
Acey is offline   Reply With Quote
Old 10-25-2013, 09:26 AM   #1747
socktape
Crash and Bang Winger
 
socktape's Avatar
 
Join Date: Jun 2008
Location: I went west as a young man
Exp:
Default

Quote:
Originally Posted by Kavvy View Post

I get how this will be a blow to some of our neighbors affected by the road... but why didn't he vote if this is devastating? Hard to feel terrible for someone didn't even try to change their fate.

Is there any chance he wasn't allowed to vote?
It is possible that he doesn't have voting rights as a full member of the band. They have fairly strict guidelines as to who is considered a full band member and who isn't.
socktape is offline   Reply With Quote
Old 10-25-2013, 09:35 AM   #1748
GGG
Franchise Player
 
GGG's Avatar
 
Join Date: Aug 2008
Location: California
Exp:
Default

Quote:
Originally Posted by V View Post
I'd bet 7-10 years. It's going to be a couple of years before they're even done all of the archeological work.

Has anything more than a conceptual design been completed?
They have done some pretty detailed engineering on the route of the hill at 16th ave and the interchanges from Mcleod to 162nd but it all needs to go through the community consulting phase.

From start of construction it will take around 3 years to build so you still have 4 years to plan to hit the 7 year mark. I would be willing to bet on opening before Dec 31st 2020.
GGG is offline   Reply With Quote
Old 10-25-2013, 09:37 AM   #1749
_Q_
#1 Goaltender
 
_Q_'s Avatar
 
Join Date: Jan 2009
Location: Calgary
Exp:
Default

Good news for the Yop-Gobblers on here.

Meh news for latte-sippers like myself. I think the provincial government now owes me more transit routes and public parks.
_Q_ is offline   Reply With Quote
Old 10-25-2013, 10:07 AM   #1750
polak
In the Sin Bin
 
Join Date: Aug 2012
Exp:
Default

Wait, so the 162nd overpass will be integrated with the Macleod and 22x interchange?

Ugh, finally. I was always confused as to why they stopped the overpasses at Shawville Blvd when 162nd was clearly the more pressing intersection. It seriously has to be one of the worst suburban intersections in the city. You can easily wait 4 or 5 lights during rush hour.
polak is offline   Reply With Quote
The Following 2 Users Say Thank You to polak For This Useful Post:
Old 10-25-2013, 10:08 AM   #1751
Slava
Franchise Player
 
Join Date: Dec 2006
Location: Calgary, Alberta
Exp:
Default

Quote:
Originally Posted by polak View Post
Wait, so the 162nd overpass will be integrated with the Macleod and 22x interchange?

Ugh, finally. I was always confused as to why they stopped the overpasses at Shawville Blvd when 162nd was clearly the more pressing intersection. It seriously has to be one of the worst suburban intersections in the city. You can easily wait 4 or 5 lights during rush hour.
Are they doing 162nd? I haven't seen that despite my thinking it is absolutely necessary.
Slava is offline   Reply With Quote
Old 10-25-2013, 10:23 AM   #1752
GGG
Franchise Player
 
GGG's Avatar
 
Join Date: Aug 2008
Location: California
Exp:
Default

Quote:
Originally Posted by Slava View Post
Are they doing 162nd? I haven't seen that despite my thinking it is absolutely necessary.
Keating during the election campaign said that the overpass there was at a high priority level with the city.

That said you will end up with weave issues with the Mcleod/22X interchange so the accesses going south will likely be limted in some way. I haven't seen any design proposals though.

The South West Ring Road will remove a lot of that congestion because all of the traffic that goes 162nd Mcleod, Anderson, 14th will go the other way. Still needed though.
GGG is offline   Reply With Quote
Old 10-25-2013, 10:28 AM   #1753
Slava
Franchise Player
 
Join Date: Dec 2006
Location: Calgary, Alberta
Exp:
Default

Quote:
Originally Posted by GGG View Post
Keating during the election campaign said that the overpass there was at a high priority level with the city.

That said you will end up with weave issues with the Mcleod/22X interchange so the accesses going south will likely be limted in some way. I haven't seen any design proposals though.

The South West Ring Road will remove a lot of that congestion because all of the traffic that goes 162nd Mcleod, Anderson, 14th will go the other way. Still needed though.
I can see some of the traffic being alleviated as you say, but there is no doubt in my mind that there are still thousands of SW residents (and an increasing amount with Providence) that will want to head North towards downtown or wherever else. The Ring Road won't be much help in that regard, and that intersection is a complete bottleneck.
Slava is offline   Reply With Quote
Old 10-25-2013, 10:34 AM   #1754
5seconds
Draft Pick
 
Join Date: Nov 2012
Default

Quote:
Originally Posted by Slava View Post
I can see some of the traffic being alleviated as you say, but there is no doubt in my mind that there are still thousands of SW residents (and an increasing amount with Providence) that will want to head North towards downtown or wherever else. The Ring Road won't be much help in that regard, and that intersection is a complete bottleneck.
It will be interesting to see what the traffic patterns look like for going downtown once the SW portion is built. The natural routes from the west side would be north on Sarcee to Bow Trail, or East on Glenmore to Crowchild. In either case upgrades would be needed downstream from the new road in order to handle increased traffic. I know there are plans to free-flow the Sarcee-Richmond interchange and the Sarcee-Bow interchange, but nothing on record for changes to the Eastbound Glenmore-Northbound Crowchild movement.

Will be interesting to see what is planned or what will be needed based on actual patterns.
5seconds is offline   Reply With Quote
Old 10-25-2013, 10:45 AM   #1755
browna
Franchise Player
 
browna's Avatar
 
Join Date: Mar 2002
Location: Calgary
Exp:
Default

Quote:
Originally Posted by 5seconds View Post
It will be interesting to see what the traffic patterns look like for going downtown once the SW portion is built. The natural routes from the west side would be north on Sarcee to Bow Trail, or East on Glenmore to Crowchild. In either case upgrades would be needed downstream from the new road in order to handle increased traffic. I know there are plans to free-flow the Sarcee-Richmond interchange and the Sarcee-Bow interchange, but nothing on record for changes to the Eastbound Glenmore-Northbound Crowchild movement.

Will be interesting to see what is planned or what will be needed based on actual patterns.
Crowchild N will be a bottleneck into DT, unless those coming from the south take Sarcee to Bow and come into DT via Bow.

The plans are in place and the right-of way marked out to expand W/E Glenmore to 3 lanes both ways from Sarcee (or at least 37st) to Crowchild.

But once one hits Crowchild, you have a single turning lane/ramp to N/B Crowchild currently. The W/B Glenmore to Crowchild should be less busy (people coming from the south/14ST) but Crowchild itself won't be as people just take a different route to get to N/B Crowchild and some may even skip going down MacLeod.

Anyways, very good news for the city. Living here my whole life, living in the south, with relatives in Killarney growing up, then going to MRC and U of C for school it never made sense to be restricted to that one and only way to and from the far SW to the mid SW with just wide open land between there. Accidents on the causeway? Would ake 90 minutes to get home from the U of C 15 years ago.

Will be interesting to see when they start the work how careful they have to be near the old CF firing range, with likley hundreds of undetonated munitions.

Last edited by browna; 10-25-2013 at 10:53 AM.
browna is offline   Reply With Quote
Old 10-25-2013, 11:03 AM   #1756
5seconds
Draft Pick
 
Join Date: Nov 2012
Default

Quote:
Originally Posted by browna View Post
Crowchild N will be a bottleneck into DT, unless those coming from the south take Sarcee to Bow and come into DT via Bow.

The plans are in place and the right-of way marked out to expand W/E Glenmore to 3 lanes both ways from Sarcee (or at least 37st) to Crowchild.

But once one hits Crowchild, you have a single turning lane/ramp to N/B Crowchild currently. The W/B Glenmore to Crowchild should be less busy (people coming from the south/14ST) but Crowchild itself won't be as people just take a different route to get to N/B Crowchild and some may even skip going down MacLeod.

Anyways, very good news for the city. Living here my whole life, living in the south, with relatives in Killarney growing up, then going to MRC and U of C for school it never made sense to be restricted to that one and only way to and from the far SW to the mid SW with just wide open land between there. Accidents on the causeway? Would ake 90 minutes to get home from the U of C 15 years ago.

Will be interesting to see when they start the work how careful they have to be near the old CF firing range, with likley hundreds of undetonated munitions.
The 2009 plans actually showed a 10-lane Glenmore! The deal would allow for widening between Sarcee and 37th street.
5seconds is offline   Reply With Quote
Old 10-25-2013, 11:05 AM   #1757
pylon
Lifetime Suspension
 
Join Date: Jul 2007
Exp:
Default

So how many KMS long will this thing be when it is completed?
pylon is offline   Reply With Quote
Old 10-25-2013, 11:24 AM   #1758
Mazrim
CP Gamemaster
 
Mazrim's Avatar
 
Join Date: Feb 2010
Location: The Gary
Exp:
Default

I think this is a good deal for the Tsuu T'ina reserve, and I hope they can invest this money they'll be receiving to improve their future. I used to live next to the Westside First Nation and being able to watch them develop their land into servicable and profitable uses is beneficial for all members of the band, and will serve future generations well.
Mazrim is offline   Reply With Quote
Old 10-25-2013, 12:05 PM   #1759
Bigtime
Franchise Player
 
Bigtime's Avatar
 
Join Date: Apr 2008
Location: Calgary
Exp:
Default

So the Herald's Jason Markusoff is trying to get the term Ringstraße going for the ring road. Let's make it happen people.
Bigtime is offline   Reply With Quote
The Following 5 Users Say Thank You to Bigtime For This Useful Post:
Old 10-25-2013, 12:17 PM   #1760
Bigtime
Franchise Player
 
Bigtime's Avatar
 
Join Date: Apr 2008
Location: Calgary
Exp:
Default

Representatives at the announcement saying the entire ring will be complete by 2020.
Bigtime is offline   Reply With Quote
Reply


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -6. The time now is 05:21 AM.

Calgary Flames
2024-25




Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright Calgarypuck 2021 | See Our Privacy Policy