Calgarypuck Forums - The Unofficial Calgary Flames Fan Community

Go Back   Calgarypuck Forums - The Unofficial Calgary Flames Fan Community > Main Forums > The Off Topic Forum
Register Forum Rules FAQ Community Calendar Today's Posts Search

Reply
 
Thread Tools Search this Thread
Old 03-16-2017, 08:08 PM   #2881
no_joke
Backup Goalie
 
Join Date: Jun 2007
Exp:
Default

I haven't researched my answer but if I understand the question correctly, it seems doubtful. I think one would want the entire north segment or south segment done before the ribbon is cut. I suspect the plan would be to construct along the entire alignment at multiple work fronts. Of course, this would require funding to be in place for the whole thing- plus (a lot of) contingency.

If it came to it, one of the lines could be built from out of downtown, say the north line to Beddington and then expanded "outbound" as they could.
no_joke is offline   Reply With Quote
Old 03-16-2017, 08:15 PM   #2882
RW99
First Line Centre
 
RW99's Avatar
 
Join Date: Oct 2005
Location: 103 104END 106 109 111 117 122 202 203 207 208 216 217 219 221 222 224 225 313 317 HC G
Exp:
Default

I'm glad the 9th Ave N station is being taken off the table. At 250 million I didn't think it was worth it. I live one block away from Centre Street at one of the above ground stations. It should be fun driving around that area for 2 years.
RW99 is offline   Reply With Quote
Old 03-16-2017, 08:36 PM   #2883
GirlySports
NOT breaking news
 
GirlySports's Avatar
 
Join Date: Jan 2007
Location: Calgary
Exp:
Default

wow that is a long tunnel
__________________
Watching the Oilers defend is like watching fire engines frantically rushing to the wrong fire

GirlySports is offline   Reply With Quote
Old 03-16-2017, 08:52 PM   #2884
MrMastodonFarm
Lifetime Suspension
 
MrMastodonFarm's Avatar
 
Join Date: Oct 2001
Exp:
Default

Quote:
Originally Posted by Wormius View Post
I like the tilt-shift work there. Are those vehicles running alongside the train real or added after for effect?
It's just an animation on top of Google Maps IIRC. The train, cars, tracks station.. basically anything that is the train route is the animated mock up. Some intersections look wonky but it's not the final product.
MrMastodonFarm is offline   Reply With Quote
Old 03-16-2017, 08:56 PM   #2885
calgarygeologist
Franchise Player
 
Join Date: Dec 2013
Exp:
Default

I haven't been up to the Beddington area in quite a while but isn't that intersection at Beddington Blvd and Center Street quite busy. I imagine that an at grade rail crossing is going to make for some crazy traffic issues.

I use 64th and Center pretty frequently and I think that will become difficult to navigate.
calgarygeologist is offline   Reply With Quote
Old 03-16-2017, 11:25 PM   #2886
GGG
Franchise Player
 
GGG's Avatar
 
Join Date: Aug 2008
Location: California
Exp:
Default

Quote:
Originally Posted by MrMastodonFarm View Post

New animation of north section of the greenline. The video does the entire line but only the north is updated.

72nd and 9th ave station are eliminated from this video
Im happy they listened to my recommendations to get rid of two stations
GGG is offline   Reply With Quote
Old 03-16-2017, 11:31 PM   #2887
STeeLy
Franchise Player
 
STeeLy's Avatar
 
Join Date: Oct 2003
Exp:
Default

Quote:
Originally Posted by calgarygeologist View Post
I haven't been up to the Beddington area in quite a while but isn't that intersection at Beddington Blvd and Center Street quite busy. I imagine that an at grade rail crossing is going to make for some crazy traffic issues.

I use 64th and Center pretty frequently and I think that will become difficult to navigate.
I don't even know where they're going to find the room to widen the road and put tracks in... Centre Street doesn't have that much room left on either side.
STeeLy is offline   Reply With Quote
Old 03-17-2017, 01:41 AM   #2888
RW99
First Line Centre
 
RW99's Avatar
 
Join Date: Oct 2005
Location: 103 104END 106 109 111 117 122 202 203 207 208 216 217 219 221 222 224 225 313 317 HC G
Exp:
Default

Quote:
Originally Posted by STeeLy View Post
I don't even know where they're going to find the room to widen the road and put tracks in... Centre Street doesn't have that much room left on either side.
Yeah, look at the 40th Ave station. Either they cut out the school and Timmy's on the West side or more houses and the church on the East side.

*edit Looks like a lot of single lanes on Centre, especially Southbound.

Last edited by RW99; 03-17-2017 at 01:46 AM.
RW99 is offline   Reply With Quote
Old 03-17-2017, 06:13 AM   #2889
Fuzz
Franchise Player
 
Fuzz's Avatar
 
Join Date: Mar 2015
Location: Pickle Jar Lake
Exp:
Default

I get the feeling 4th st is going to get a lot busier. The really messy phase is going to be construction.
Fuzz is offline   Reply With Quote
Old 03-17-2017, 06:49 AM   #2890
Bigtime
Franchise Player
 
Bigtime's Avatar
 
Join Date: Apr 2008
Location: Calgary
Exp:
Default

Dang it I want my 9th avenue bomb shelter station!

New apocalypse plan, we walk over to the 2nd avenue underground station and then walk into the tunnel northbound until we reach the deepest point that would not flood should the Bow breech the tunnel.
Bigtime is offline   Reply With Quote
Old 03-17-2017, 07:06 AM   #2891
Table 5
Franchise Player
 
Table 5's Avatar
 
Join Date: Oct 2001
Location: NYYC
Exp:
Default

Not having a station between 16th and downtown is going to look pretty silly in 20-30 years time.
Table 5 is offline   Reply With Quote
The Following 9 Users Say Thank You to Table 5 For This Useful Post:
Old 03-17-2017, 07:14 AM   #2892
Fuzz
Franchise Player
 
Fuzz's Avatar
 
Join Date: Mar 2015
Location: Pickle Jar Lake
Exp:
Default

I wonder if they can engineer it in a way that makes adding a station in the future possible. Not sure how you would excavate though. Mole men?
Fuzz is offline   Reply With Quote
Old 03-17-2017, 07:25 AM   #2893
Wormius
Franchise Player
 
Wormius's Avatar
 
Join Date: Feb 2011
Location: Somewhere down the crazy river.
Exp:
Default

Quote:
Originally Posted by Fuzz View Post
I wonder if they can engineer it in a way that makes adding a station in the future possible. Not sure how you would excavate though. Mole men?


Maybe just prepare the surrounding area of the tunnel for the underground portion of platform at least.
Wormius is offline   Reply With Quote
Old 03-17-2017, 07:41 AM   #2894
Ozy_Flame

Posted the 6 millionth post!
 
Ozy_Flame's Avatar
 
Join Date: Feb 2002
Exp:
Default

Quote:
Originally Posted by Table 5 View Post
Not having a station between 16th and downtown is going to look pretty silly in 20-30 years time.
If they want to revitalize that straight, this is the worst way to do it.
Ozy_Flame is offline   Reply With Quote
Old 03-17-2017, 08:07 AM   #2895
GGG
Franchise Player
 
GGG's Avatar
 
Join Date: Aug 2008
Location: California
Exp:
Default

Quote:
Originally Posted by Table 5 View Post
Not having a station between 16th and downtown is going to look pretty silly in 20-30 years time.
No it won't, for local trips the bus is a very viable option for short trips.

What benefit does the train bring over a bus for the people living south of say 10th st. and the south end of the station is effectively located at 14th st. As soon as the alignment under the river was selected that station made no sense.

You can probably build 5 peace bridges for the cost of that station. So adding a pedestrian bridge option to the centre st underpass or another bridge is a far better option to get people who are down the hill. And depending on where you are you will have bridgeland, sunny side, 14th or 2nd ave within a 1km walk, most will be closer than that.
GGG is offline   Reply With Quote
Old 03-17-2017, 08:38 AM   #2896
Lubicon
Franchise Player
 
Join Date: Jun 2015
Exp:
Default

Quote:
Originally Posted by STeeLy View Post
I don't even know where they're going to find the room to widen the road and put tracks in... Centre Street doesn't have that much room left on either side.
I don't think they are going to widen Centre, my understanding is they will reduce it to one lane in each direction (?). I stand to be corrected on that however.

And yes, I also feel eliminating the 9th Ave Station is a mistake. I also question the fact it would cost $250 million to build? That seems hugely expensive given the tunnel will already be there. So $250 million essentially for stairs/escalators, and some cement platforms?
Lubicon is offline   Reply With Quote
Old 03-17-2017, 08:53 AM   #2897
Fuzz
Franchise Player
 
Fuzz's Avatar
 
Join Date: Mar 2015
Location: Pickle Jar Lake
Exp:
Default

I think it is becuase this is being done with a tunnel boring machine. So to skip the station, they just run the machine right through. To add it, you would have to excavate a large area with other equipment, and reinforce the ceilings, as well as all the access space to get down there. I could see $250 million being realistic.
Fuzz is offline   Reply With Quote
Old 03-17-2017, 08:57 AM   #2898
ken0042
Playboy Mansion Poolboy
 
ken0042's Avatar
 
Join Date: Apr 2004
Location: Close enough to make a beer run during a TV timeout
Exp:
Default

Quote:
Originally Posted by Table 5 View Post
Not having a station between 16th and downtown is going to look pretty silly in 20-30 years time.
Or having the train pass through a station that has been decommissioned due to excessive maintenance costs and extreme lack of use is going to look silly in much shorter than 20 years. Especially when we consider that we spent 5% of the budget for the 45 km line on that one station.

I know with the other lines there are things that should have been done better. Elevate or bury 36th street. Downtown subway. I don't see this as being the same thing.
ken0042 is offline   Reply With Quote
The Following User Says Thank You to ken0042 For This Useful Post:
Old 03-17-2017, 09:02 AM   #2899
STeeLy
Franchise Player
 
STeeLy's Avatar
 
Join Date: Oct 2003
Exp:
Default

Quote:
Originally Posted by RW99 View Post
Yeah, look at the 40th Ave station. Either they cut out the school and Timmy's on the West side or more houses and the church on the East side.

*edit Looks like a lot of single lanes on Centre, especially Southbound.
Even looking at it from the north end, around the Beddington area where the Safeway and Co-op are... they have to widen that to make it 2 lanes both ways and have the tracks in the middle, and there isn't much room to widen it.

Even if they use single lane traffic, without widening, how would they have tracks (which essentially take up one lane in each direction) and platforms at the stops?

I'm not an engineer or architect by any means, just some random citizen observations.
STeeLy is offline   Reply With Quote
Old 03-17-2017, 09:21 AM   #2900
Knalus
Powerplay Quarterback
 
Knalus's Avatar
 
Join Date: Jan 2009
Location: Calgary
Exp:
Default

Quote:
Originally Posted by RW99 View Post
Yeah, look at the 40th Ave station. Either they cut out the school and Timmy's on the West side or more houses and the church on the East side.

*edit Looks like a lot of single lanes on Centre, especially Southbound.
To the point where it almost looks like the entire road is being removed for the train. Very strange.
Knalus is offline   Reply With Quote
The Following 2 Users Say Thank You to Knalus For This Useful Post:
Reply

Tags
c-train , calgary transit , information , lrt , renderings


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -6. The time now is 02:48 AM.

Calgary Flames
2024-25




Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright Calgarypuck 2021 | See Our Privacy Policy