View Poll Results: Do you support the current version of CalgaryNEXT?
|
Yes
|
  
|
163 |
25.39% |
No
|
  
|
356 |
55.45% |
Undecided
|
  
|
123 |
19.16% |
11-16-2016, 11:10 AM
|
#2881
|
Franchise Player
Join Date: Apr 2012
Location: Maryland State House, Annapolis
|
FYI the link to the PDF doesn't work, or it's gone (404 error).
__________________
"Think I'm gonna be the scapegoat for the whole damn machine? Sheeee......."
|
|
|
11-16-2016, 11:32 AM
|
#2882
|
Franchise Player
|
Quote:
Originally Posted by Senator Clay Davis
FYI the link to the PDF doesn't work, or it's gone (404 error).
|
http://agendaminutes.calgary.ca/sire...6113244714.PDF
Hopefully that works.
I would guess Administration will say this is there in case Plan B is chosen (it was Administration's preference in last report). Notably, nary a mention of West Village - City wants to keep focusing on the east end it seems for now.
__________________
Trust the snake.
|
|
|
The Following User Says Thank You to Bunk For This Useful Post:
|
|
11-16-2016, 11:43 AM
|
#2883
|
Franchise Player
Join Date: Feb 2006
Location: Calgary, AB
|
Quote:
Originally Posted by Bunk
|
That link will expire soon too. All the document links on the city's agenda pages are dynamically generated and are only good for a limited time.
The only thing that seems to work is to link to the links to the documents: http://agendaminutes.calgary.ca/sire...a&itemid=45942
The document in question is the one named: ACTION PLAN MID-CYCLE ADJUSTMENTS, C2016-0863 - Attach 2 -The Citys Capital Investment
__________________
Turn up the good, turn down the suck!
|
|
|
The Following User Says Thank You to getbak For This Useful Post:
|
|
11-16-2016, 12:56 PM
|
#2884
|
Franchise Player
|
Quote:
Originally Posted by getbak
That link will expire soon too. All the document links on the city's agenda pages are dynamically generated and are only good for a limited time.
The only thing that seems to work is to link to the links to the documents: http://agendaminutes.calgary.ca/sire...a&itemid=45942
The document in question is the one named: ACTION PLAN MID-CYCLE ADJUSTMENTS, C2016-0863 - Attach 2 -The Citys Capital Investment
|
I don't understand the internets
__________________
Trust the snake.
|
|
|
11-16-2016, 01:02 PM
|
#2885
|
Franchise Player
Join Date: Feb 2006
Location: Calgary, AB
|
Quote:
Originally Posted by Bunk
I don't understand the internets
|
I'm not sure why it's set up that way, but it's pretty annoying.
__________________
Turn up the good, turn down the suck!
|
|
|
11-24-2016, 01:38 PM
|
#2886
|
Draft Pick
Join Date: Dec 2014
Location: Calgary
|
This is the problem I have had with this whole thign all along.
CSEC have been utterly misleading, completely bone headed and very much a joke with how they've released the information and renderings for this project.
There's a media release link that has all the renderings that they presented to council behind doors back in August It finally was made public after they had the meeting and council agreed to keep looking at Plan B and consider the original plan also,
There's so much stuff that they have packed into this that we have no information on.
SOme of the renderings show Bowtrail next to the river as a tunnel with a walking/gathering outdoor area leading down to a nice fountain right on the river. THat was never shown or discussed.
Media Page with renderings here: http://calgarynext.com/media.php
For example:

Lrt entrance:

East side Entrance:

Another view of the river:
Such a disengenuous way of selling this thing. How much extra is burrying Bowtrail gonna cost? where are those figures? Is that included in the 1.3B (according to them) or is that gonna cost more if the city wants to do this right.
|
|
|
The Following 5 Users Say Thank You to johnnybegaudreau For This Useful Post:
|
|
11-24-2016, 02:15 PM
|
#2887
|
Franchise Player
Join Date: Aug 2007
Location: Vancouver
|
Quote:
Originally Posted by johnnybegaudreau
This is the problem I have had with this whole thign all along.
CSEC have been utterly misleading, completely bone headed and very much a joke with how they've released the information and renderings for this project.
There's a media release link that has all the renderings that they presented to council behind doors back in August It finally was made public after they had the meeting and council agreed to keep looking at Plan B and consider the original plan also,
There's so much stuff that they have packed into this that we have no information on.
SOme of the renderings show Bowtrail next to the river as a tunnel with a walking/gathering outdoor area leading down to a nice fountain right on the river. THat was never shown or discussed.
Media Page with renderings here: http://calgarynext.com/media.php
For example:
Such a disengenuous way of selling this thing. How much extra is burrying Bowtrail gonna cost? where are those figures? Is that included in the 1.3B (according to them) or is that gonna cost more if the city wants to do this right.
|
If this project is done in conjuncture with a redux of the Bow/Crowchild/Memorial interchange, I say the city should just pony up and do it. It has to be done sometime, do it all at once. If the Flames pay for the building (which their plan largely indicated they would IIRC), and the city pays for the necessary changes, I'd call it a win for everyone.
Build a great building, clean up the creosote, fix the traffic congestion, and create a beautiful space from what is a pretty down-trodden area at the moment.
A massive infrastructure project like that would be an economic boost to the city in a bad time (albeit, mostly temporary, but so is the oil price).
__________________
|
|
|
The Following 7 Users Say Thank You to Coach For This Useful Post:
|
|
11-24-2016, 02:24 PM
|
#2888
|
Powerplay Quarterback
Join Date: Apr 2015
Location: ...the bench
|
Quote:
Originally Posted by johnnybegaudreau
Lrt entrance:

|
man that's some basic photoshopping skills there....for example: you can see the white space between his and her face sitting on the bench...
still better than what we, the public, saw, but nothing about this screams 'detail-oriented and professional'. Rushed, amateur, and poorly planned/designed, right down to the mock ups.
Last edited by Benched; 11-24-2016 at 02:26 PM.
|
|
|
The Following 4 Users Say Thank You to Benched For This Useful Post:
|
|
11-24-2016, 02:39 PM
|
#2889
|
Franchise Player
|
I don't recall them initially talking about making (a re-aligned) west-bound bow trail a tunnel underneath the project to connect the riverfront directly, but that latest renderings all show that. How much would that cost? The cost would be pretty immense to do it as illustrated here.
The original plan (and presumably the costing submitted - this figure hasn't changed of late) was this:
__________________
Trust the snake.
Last edited by Bunk; 11-24-2016 at 02:45 PM.
|
|
|
11-24-2016, 02:41 PM
|
#2890
|
Powerplay Quarterback
|
Quote:
Originally Posted by jayswin
You'd better never touch the left lane if that's your travel time, mister. 
|
6 hours includes coming back from poopmonton
|
|
|
The Following User Says Thank You to stone hands For This Useful Post:
|
|
11-24-2016, 02:47 PM
|
#2891
|
Some kinda newsbreaker!
Join Date: May 2004
Location: Learning Phaneufs skating style
|
The original renderings never had the river walk area. As evidenced by this thread:
http://forum.calgarypuck.com/showthr...ht=calgaryNEXT
Looks like something optional.they are considering.
|
|
|
11-24-2016, 02:49 PM
|
#2892
|
#1 Goaltender
Join Date: Oct 2009
Location: North of the River, South of the Bluff
|
This thing isn't dead yet? FML, get on with Plan B. One up Edmonton on all the features and call it a day. Be true Calgarians for once CSEC.
|
|
|
The Following User Says Thank You to OldDutch For This Useful Post:
|
|
11-24-2016, 02:52 PM
|
#2893
|
 Posted the 6 millionth post!
|
Never, I repeat, NEVER take renderings as gospel.
Think of it as a wireframe or a mockup before the actual design is conducted, used to sell the client on the idea.
|
|
|
11-24-2016, 02:54 PM
|
#2894
|
First Line Centre
Join Date: Oct 2009
Location: Calgary
|
Quote:
Originally Posted by johnnybegaudreau
Such a disengenuous way of selling this thing. How much extra is burrying Bowtrail gonna cost? where are those figures? Is that included in the 1.3B (according to them) or is that gonna cost more if the city wants to do this right.
|
I don't think Bow Trail is buried in those renderings. It looks more like a covering of Bow Trail and having the North side seamlessly connect to the riverwalk without moving Bow trail at all.
|
|
|
The Following User Says Thank You to RM14 For This Useful Post:
|
|
11-24-2016, 02:56 PM
|
#2895
|
Franchise Player
Join Date: Apr 2012
Location: Maryland State House, Annapolis
|
Still wanting some Plan B renderings.
__________________
"Think I'm gonna be the scapegoat for the whole damn machine? Sheeee......."
|
|
|
The Following User Says Thank You to Senator Clay Davis For This Useful Post:
|
|
11-24-2016, 02:58 PM
|
#2896
|
Franchise Player
|
Quote:
Originally Posted by Senator Clay Davis
Still wanting some Plan B renderings.
|
They're just trying to find a good pic of the Space Needle to add in there before they release them.
|
|
|
The Following 2 Users Say Thank You to nik- For This Useful Post:
|
|
11-24-2016, 02:59 PM
|
#2897
|
Franchise Player
|
CSEC are one-upping Katz group, quite significantly.
Katz and his buddies, when the deal closed, contributed 165.5M to the project. 26.9% of the estimated costs.
CSEC, out of the gate, is offering up 200M. 22.5% of estimated costs when you count the fieldhouse. Remove the fieldhouse, and CSEC are proposing 29% of the total estimated costs.
Keep in mind, that's CSEC's opening offer. That will go up if CalgaryNEXT becomes a real project.
|
|
|
11-24-2016, 02:59 PM
|
#2898
|
Franchise Player
Join Date: Apr 2012
Location: Maryland State House, Annapolis
|
Quote:
Originally Posted by nik-
They're just trying to find a good pic of the Space Needle to add in there before they release them.
|
Based off the renderings we've seen here, they'll probably make it the Sears Tower instead.
__________________
"Think I'm gonna be the scapegoat for the whole damn machine? Sheeee......."
|
|
|
11-24-2016, 03:02 PM
|
#2899
|
Franchise Player
|
Quote:
Originally Posted by Senator Clay Davis
Based off the renderings we've seen here, they'll probably make it the Sears Tower instead.
|
And in 8 bit.
|
|
|
11-24-2016, 03:03 PM
|
#2900
|
Franchise Player
Join Date: Apr 2012
Location: Maryland State House, Annapolis
|
Quote:
Originally Posted by nik-
And in 8 bit.
|
So long as the Final Fantasy V soundtrack comes with it, we're good.
__________________
"Think I'm gonna be the scapegoat for the whole damn machine? Sheeee......."
|
|
|
Posting Rules
|
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts
HTML code is Off
|
|
|
All times are GMT -6. The time now is 11:01 AM.
|
|