View Poll Results: When will the ring road be completed?
1-3 years 8 3.85%
4-7 years 91 43.75%
7-10 years 65 31.25%
10-20 years 20 9.62%
Never 24 11.54%
Voters: 208. You may not vote on this poll

Reply
 
Thread Tools Search this Thread
Old 10-26-2013, 10:12 PM   #1861
Slava
Franchise Player
 
Join Date: Dec 2006
Location: Calgary, Alberta
Exp:
Default

Quote:
Originally Posted by Regulator75 View Post
So, 24th st will no longer link to 22X.

Boooo...
That's been the works for years. An aldermanic candidate in 2010 and I were talking about that. When that happens those poor people have to drive 162nd to MacLeod (basically, although maybe Mckevitt). Regardless of your route though, a day like Monday could mean an hour or more to MacLeod. Good times.
Slava is offline   Reply With Quote
Old 10-26-2013, 11:08 PM   #1862
Acey
Franchise Player
 
Join Date: Nov 2009
Location: Calgary
Exp:
Default

Tough to say how long it'll take to go west to Stoney and cut across on Anderson. Definitely not an hour.
Acey is offline   Reply With Quote
Old 10-27-2013, 03:32 PM   #1863
GGG
Franchise Player
 
GGG's Avatar
 
Join Date: Aug 2008
Location: California
Exp:
Default

Quote:
Originally Posted by Slava View Post
That's been the works for years. An aldermanic candidate in 2010 and I were talking about that. When that happens those poor people have to drive 162nd to MacLeod (basically, although maybe Mckevitt). Regardless of your route though, a day like Monday could mean an hour or more to MacLeod. Good times.
If you are taking 24th onto the 22x driving through bridlewood to get to Mkevit to go east bound or driving to 162nd to go northbound isnt a big deal in my opinion. Generally I find 162nd to north bound Mcleod faster in rush hour than the 22x anyway. Also access to Mcleod via Anderson road may become a more attractive option as well.

Selfishly its going to take a few minutes longer to get to banff as 6th street is the only access to go west towards Bragg because Mckevit doesnt go west and 162nd doesnt go south. Although the ring road to 16th ave will probably faster than through Bragg once complete.

I am quite satisfied with Bridlewwods access to the ring road.
GGG is offline   Reply With Quote
Old 10-27-2013, 05:18 PM   #1864
Mazrim
CP Gamemaster
 
Mazrim's Avatar
 
Join Date: Feb 2010
Location: The Gary
Exp:
Default

Quote:
Originally Posted by Acey View Post
$2B is my guess. Huge three level interchange at Glenmore/Sarcee which includes 2 tunnels, extensive modification to the existing three level interchange at 16 Ave, big interchange at 22X, extensive modification to the existing Macleod/22X interchange, very long bridges due to the ultimate plan, moving/demolishing tons of stuff, tons of earthworks, realigning rivers/creeks, 2nd bridge over the Bow north of 16 Ave could get thrown into the contract as well.
The second bridge over the Bow would need to be started when they do "West Stoney Trail" aka 16th Avenue to Highway 8. I say that because there's a chance they could divide the job into parts. Your estimate is as good as any right now though. Tunnels would be a lose term I imagine, since I doubt they would be fully enclosed needing ventilation.

Quote:
Originally Posted by onetwo_threefour View Post
Is it just me or is Weaselhead spelled wrong on the map? Stuff like that drives me crazy assuming the source of this is an official planning document. It's a multi-billion dollar project, let's pay attention to details fellas.
Spelling mistakes happen too often in everything, official or not. A couple signage typo examples include "Nosehill Drive" instead of "Nose Hill Drive" on Stoney over the Bow River, and "114 Street" instead of "114 Avenue" on SE Stoney.
Mazrim is offline   Reply With Quote
Old 10-27-2013, 05:48 PM   #1865
1stLand
Lifetime Suspension
 
Join Date: Jan 2010
Location: Calgary
Exp:
Default

I will refer to the new portion of the ring road as the 'Tina
1stLand is offline   Reply With Quote
Old 10-27-2013, 05:58 PM   #1866
Kavvy
Self Imposed Exile
 
Join Date: Jul 2008
Location: Calgary
Exp:
Default

Just found this on wikipedia, except for the ones on the reserve, all the coordinates of the proposed Stony Trail plopped on google Maps. I would assume you could export it as a KML file if you wanted your own file of it.

As the ones on the reserve are the ones of most interest, what the link shows is sort of common knowledge, but maybe someone will add the route in the reserve now that a deal has been made:

Link

Why in the world did they build discovery ridge right there? Would be better if Highway 8 was it's own independent connector.
Edit: Answered my own question, it would probably be to long of a detour through the reserve, causing more controversy and money.

Last edited by Kavvy; 10-27-2013 at 06:31 PM.
Kavvy is offline   Reply With Quote
The Following User Says Thank You to Kavvy For This Useful Post:
Old 10-27-2013, 06:00 PM   #1867
Acey
Franchise Player
 
Join Date: Nov 2009
Location: Calgary
Exp:
Default

Quote:
Originally Posted by GGG View Post
Mckevit doesnt go west and 162nd doesnt go south.
There's a loop ramp there allowing both directions of McKevitt to go west on 22X.
Acey is offline   Reply With Quote
The Following User Says Thank You to Acey For This Useful Post:
GGG
Old 10-27-2013, 06:05 PM   #1868
5seconds
Draft Pick
 
Join Date: Nov 2012
Default

I have put together a fairly comprehensive review of the 2013 agreement, and includes some interesting things I haven't seen covered in the news.

http://calgaryringroad.wordpress.com...nt-and-design/
5seconds is offline   Reply With Quote
The Following 11 Users Say Thank You to 5seconds For This Useful Post:
Old 10-27-2013, 06:23 PM   #1869
rayne008
Powerplay Quarterback
 
rayne008's Avatar
 
Join Date: Apr 2007
Exp:
Default

So the plan for the west end of the ring road is to go right up the hill from Stoney/Hwy 1, through the KOA campground and Burnco and run near or on 101 st?
rayne008 is offline   Reply With Quote
Old 10-27-2013, 06:37 PM   #1870
Acey
Franchise Player
 
Join Date: Nov 2009
Location: Calgary
Exp:
Default

Yep, south of 16th it's going to curve a bit to the east toward Cougar Ridge then go due south from there. Around Bow Trail it curves back slightly to the southwest to get around Springbank Hill, then curves a bit back to the southeast again to meet up with Glenmore.

The whole thing is east of the current 101 St.
Acey is offline   Reply With Quote
Old 10-27-2013, 07:55 PM   #1871
BigNumbers
Powerplay Quarterback
 
BigNumbers's Avatar
 
Join Date: Jan 2013
Exp:
Default

Quote:
Originally Posted by Acey View Post
Yep, south of 16th it's going to curve a bit to the east toward Cougar Ridge then go due south from there. Around Bow Trail it curves back slightly to the southwest to get around Springbank Hill, then curves a bit back to the southeast again to meet up with Glenmore.

The whole thing is east of the current 101 St.
Is there a map of this? I am interested in how they expect it to go . I can't see it going east of 101 st. It will likely have to go west of the existing 101 street, as 101 is still on springbank hill. Going ab ~115 st would be in the valley at the foot of the hill and connect nicely as it wraps around the hill, to Glenmore.
BigNumbers is offline   Reply With Quote
Old 10-27-2013, 08:02 PM   #1872
Brannigans Law
First Line Centre
 
Brannigans Law's Avatar
 
Join Date: Sep 2012
Location: Calgary AB
Exp:
Default

Quote:
Originally Posted by ken0042 View Post
To save the "Cranston Crying" we will see 5-7 years from now; I may as well make sure everybody is aware of this now:

Brannigans Law is offline   Reply With Quote
The Following User Says Thank You to Brannigans Law For This Useful Post:
Old 10-27-2013, 08:06 PM   #1873
Acey
Franchise Player
 
Join Date: Nov 2009
Location: Calgary
Exp:
Default

Quote:
Originally Posted by BigNumbers View Post
Is there a map of this? I am interested in how they expect it to go . I can't see it going east of 101 st. It will likely have to go west of the existing 101 street, as 101 is still on springbank hill. Going ab ~115 st would be in the valley at the foot of the hill and connect nicely as it wraps around the hill, to Glenmore.

(1/2)
(2/2)
Acey is offline   Reply With Quote
The Following 3 Users Say Thank You to Acey For This Useful Post:
Old 10-27-2013, 08:09 PM   #1874
GGG
Franchise Player
 
GGG's Avatar
 
Join Date: Aug 2008
Location: California
Exp:
Default

Quote:
Originally Posted by rayne008 View Post
So the plan for the west end of the ring road is to go right up the hill from Stoney/Hwy 1, through the KOA campground and Burnco and run near or on 101 st?
Pretty much, the route up the hill might change a bit because to meet the provinces required maximum grade you have to basically cut the top of the hill off. Or they might relax the max grace requirement.
GGG is offline   Reply With Quote
Old 10-27-2013, 08:41 PM   #1875
Acey
Franchise Player
 
Join Date: Nov 2009
Location: Calgary
Exp:
Default

That grade being 3.0% max. 22X on the east and west side of the Bow River is 3.6% and 4.0%, respectively... so an exception was made there because the road was already existing. Exceptions also made for the off-ramps to Chaparral and McKenzie Lake Blvd again because of the river, both relaxed from 4.0% to 6.0%.

They'll ideally want it at 3.0% but I'm assuming there will be some cost-benefit analysis done and if there is any kind of significant savings at 3.5 or 4% they'd probably do it. There's like 40 exceptions being made for NE Anthony Henday to various rules, obviously an extremely complicated project though. I dunno... I'm not an engineer.
Acey is offline   Reply With Quote
Old 10-27-2013, 09:51 PM   #1876
stampsx2
First Line Centre
 
stampsx2's Avatar
 
Join Date: Aug 2009
Location: Calgary
Exp:
Default

Quote:
Originally Posted by Acey View Post
Wow the engineers are big on limiting community access. Won't this cost the city more later with increased loads on community streets and maybe the city having to build additional and wider roads in future communities?

Looks like there's no southbound access onto/from old banff coach road and no northbound access onto/from 17th.
stampsx2 is offline   Reply With Quote
Old 10-27-2013, 10:02 PM   #1877
Jedi Ninja
Scoring Winger
 
Jedi Ninja's Avatar
 
Join Date: Mar 2009
Exp:
Default

Quote:
Originally Posted by Acey View Post
That grade being 3.0% max. 22X on the east and west side of the Bow River is 3.6% and 4.0%, respectively... so an exception was made there because the road was already existing. Exceptions also made for the off-ramps to Chaparral and McKenzie Lake Blvd again because of the river, both relaxed from 4.0% to 6.0%.

They'll ideally want it at 3.0% but I'm assuming there will be some cost-benefit analysis done and if there is any kind of significant savings at 3.5 or 4% they'd probably do it. There's like 40 exceptions being made for NE Anthony Henday to various rules, obviously an extremely complicated project though. I dunno... I'm not an engineer.
This is the elevation profile I have based on Google Earth data:

Hwy 1: 3700 feet
Old Banff: 4080 feet
Bow Trail: 4070 feet:
17 Ave: 3850 feet
Hwy 8: 3700 feet
Elevation Gain: 380 feet

I am no engineer either, but my calculations are that it would take 3.9km of trenching (all the way to Bow Trail) to gain 380 feet of elevation at 3% grade and 2.3km (up to Old Banff) at 5% grade. They have to build overpasses for both Old Banff and Bow Trail, so I am assuming they will just go with a 3% grade and trench the whole thing?

Never realized until just now that the elevation change down to Hwy 8 is just as much as coming up from Hwy 1... I hope the residents of Elbow Valley enjoy the sound of engine brakes.
Jedi Ninja is offline   Reply With Quote
The Following 2 Users Say Thank You to Jedi Ninja For This Useful Post:
Old 10-27-2013, 10:06 PM   #1878
Jedi Ninja
Scoring Winger
 
Jedi Ninja's Avatar
 
Join Date: Mar 2009
Exp:
Default

Quote:
Originally Posted by stampsx2 View Post
Wow the engineers are big on limiting community access. Won't this cost the city more later with increased loads on community streets and maybe the city having to build additional and wider roads in future communities?

Looks like there's no southbound access onto/from old banff coach road and no northbound access onto/from 17th.
I am assuming this is done to limit the volume of traffic entering both of these roadways from the ring road. Regardless, looks like you will be able to jog over to 101 St and backtracking to accomplish whatever access you reqiure.

Last edited by Jedi Ninja; 10-27-2013 at 10:09 PM.
Jedi Ninja is offline   Reply With Quote
Old 10-27-2013, 10:08 PM   #1879
Acey
Franchise Player
 
Join Date: Nov 2009
Location: Calgary
Exp:
Default

Quote:
Originally Posted by stampsx2 View Post
Wow the engineers are big on limiting community access.
They're big on following the rules. Sadly for us, the rules aren't very accommodating on providing access for communities.
Acey is offline   Reply With Quote
Old 10-28-2013, 07:29 AM   #1880
Resolute 14
In the Sin Bin
 
Resolute 14's Avatar
 
Join Date: Jan 2003
Exp:
Default

Plus, they don't want to turn Stoney into another Deerfoot where there is interchange after interchange after interchange all on top of each other. It's dangerous and causes backups and accidents.
Resolute 14 is offline   Reply With Quote
The Following 3 Users Say Thank You to Resolute 14 For This Useful Post:
Reply


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -6. The time now is 11:50 AM.

Calgary Flames
2024-25




Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright Calgarypuck 2021 | See Our Privacy Policy