Originally Posted by moncton golden flames View Post
hey bunk,

what is the city's plan for st georges drive, north of the new science centre to 8 avenue ne? it's currently a gravel and pothole messed and has been for years. i have noticed that there is signage on 8 avenue directing people to science centre via this route, so shouldn't it be some sort of priority to at least pave the damn thing?
Good question - I've wondered the same thing. I'll look into it.
__________________
Trust the snake.
Bunk is offline   Reply With Quote
The Following 2 Users Say Thank You to Bunk For This Useful Post:
Old 06-06-2013, 11:59 PM   #442
SebC
tromboner
 
SebC's Avatar
 
Join Date: Mar 2006
Location: where the lattes are
Exp:
Default

Quote:
Originally Posted by Bunk View Post
Holy, that's a big question to answer. Rather than me trying to summarize you might just want to comb through the budget documents and Our City Our Budget Our Future (3 year budget) to see the departments you're interested in.
It is, and I tried that... and found myself looking at a huge document. I was hoping you could provide something more distilled. Oh well.
SebC is offline   Reply With Quote
Old 06-07-2013, 01:45 PM   #443
morgin
Scoring Winger
 
Join Date: Mar 2009
Exp:
Default

Quote:
Originally Posted by fotze View Post
More of a GMG but city related.

Does the city only get use of the road scraping machine for 3 days and they have to do the entire years worth of scraping, even if it means the road stays that way for months awaiting re-surfacing. The gap in time between the scrape (or whatever its called) and the paving seems very non-optimal.
There's a lot of these weird things with the roads department I find.

For example, choosing to do street cleaning in a neighborhood where extensive sidewalk replacement is ongoing. So, every single stretch of road available to park on has street cleaning - no parking signs from 7am-5pm, and the places where they havn't put those signs have no parking cones put up by the sidewalk replacement contractor. There is literally no available street parking in an approximately 8 block radius around my house for the next two day from 7am onward (I don't leave for work at 7am, so not sure where my car should go).

The sidewalk people aren't even close to done either, and are making a pretty decent mess, so I can only imagine that the street cleaning will need to be redone anyway. You'd think it isn't rocket science to delay cleaning until the construction work is done.

Last edited by morgin; 06-07-2013 at 01:47 PM.
morgin is offline   Reply With Quote
Old 06-07-2013, 03:44 PM   #444
Bunk
Franchise Player
 
Bunk's Avatar
 
Join Date: Jul 2006
Exp:
Default

Quote:
Originally Posted by SebC View Post
It is, and I tried that... and found myself looking at a huge document. I was hoping you could provide something more distilled. Oh well.
If I knew how to distill it I would. Sorry about that.
__________________
Trust the snake.
Bunk is offline   Reply With Quote
Old 06-07-2013, 03:46 PM   #445
Bunk
Franchise Player
 
Bunk's Avatar
 
Join Date: Jul 2006
Exp:
Default

Quote:
Originally Posted by fotze View Post
More of a GMG but city related.

Does the city only get use of the road scraping machine for 3 days and they have to do the entire years worth of scraping, even if it means the road stays that way for months awaiting re-surfacing. The gap in time between the scrape (or whatever its called) and the paving seems very non-optimal.
9th and 12th Avenues are scraped now - as well as Macleod Trail. I believe they usually do the surface overlays within a couple of weeks anyway - haven't myself seen it in that state much longer than that. Any particular road you're thinking of?
__________________
Trust the snake.
Bunk is offline   Reply With Quote
Old 06-07-2013, 03:49 PM   #446
jar_e
Franchise Player
 
jar_e's Avatar
 
Join Date: Mar 2006
Exp:
Default

Quote:
Originally Posted by Bunk View Post
9th and 12th Avenues are scraped now - as well as Macleod Trail. I believe they usually do the surface overlays within a couple of weeks anyway - haven't myself seen it in that state much longer than that. Any particular road you're thinking of?
FWIW, I know 12 Avenue at least gets partially paved next wednesday.
jar_e is offline   Reply With Quote
Old 06-09-2013, 01:18 AM   #447
RedMileDJ
Lifetime Suspension
 
Join Date: Sep 2007
Location: blow me
Exp:
Default

I have no idea if this has been asked or not, and I can't find the info on the city website:

I have 2 questions:

1. What is the projected date of the ring road being connected and finished up to 22x?

2. What's the deal with Deerfoot over Glenmore? Is this getting widened?

Please provide links and whatever information you have.

On a side note: thanks for answering all questions Bunk, and providing links whenever you can. Although I don't support your boss, I am impressed that you've been able to keep up with this thread and represent him properly. It's nice to know that you can get the information we ask for, on a timely basis.
RedMileDJ is offline   Reply With Quote
Old 06-09-2013, 07:42 AM   #448
PeteLFan
Lifetime Suspension
 
Join Date: Jul 2010
Exp:
Default

When will the ridiculous amount of potholes get fixed? The city should be liable for any damages to my car.
PeteLFan is offline   Reply With Quote
Old 06-09-2013, 08:16 AM   #449
stampsx2
First Line Centre
 
stampsx2's Avatar
 
Join Date: Aug 2009
Location: Calgary
Exp:
Default

When will 162nd at MacLeod get fixed? 15 minutes to get through an intersection every morning is too long.

Have city planners considered the extra traffic volume on the 22x MacLeod overpass once stoney is complete. The backups at the westbound lights is getting bad.
stampsx2 is offline   Reply With Quote
Old 06-09-2013, 11:09 AM   #450
CaptainYooh
Franchise Player
 
CaptainYooh's Avatar
 
Join Date: Jan 2010
Location: Calgary
Exp:
Default

Quote:
Originally Posted by Red-Mile-DJ View Post
...

1. What is the projected date of the ring road being connected and finished up to 22x?..
I assume you're asking about the SW connection.

I had a chance to ask Nenshi this question personally at an event he was attending earler this year. His answer was: "by 2017 for sure, based on where things are."

Minister McIver was not so sure, when I asked him the same question, unfortunately.
CaptainYooh is offline   Reply With Quote
Old 06-09-2013, 11:21 AM   #451
Brannigans Law
First Line Centre
 
Brannigans Law's Avatar
 
Join Date: Sep 2012
Location: Calgary AB
Exp:
Default

Quote:
Originally Posted by Red-Mile-DJ View Post
I have no idea if this has been asked or not, and I can't find the info on the city website:

I have 2 questions:

1. What is the projected date of the ring road being connected and finished up to 22x?
I just googled it and a news story says it's on schedule and budget for October finish. From 17th ave to 22x that is. This will be great for people wanting to visit friends and family on opposite ends of the city (Royal Oak to Auburn Bay for instance)
Brannigans Law is offline   Reply With Quote
The Following 2 Users Say Thank You to Brannigans Law For This Useful Post:
Old 06-09-2013, 12:56 PM   #452
Rudee
Lifetime Suspension
 
Join Date: Jul 2012
Exp:
Default

Quote:
Originally Posted by stampsx2 View Post
When will 162nd at MacLeod get fixed? 15 minutes to get through an intersection every morning is too long.

Getting on Macleod trail via 162nd ave or James McKevitt Rd is going to be a nightmare once the additional 1700 new homes get built in Shawnee. I'm in Evergreen Estates and this new development will effect all the other adjacent communities. Not a happy camper.
Rudee is offline   Reply With Quote
Old 06-09-2013, 01:05 PM   #453
Mr.Coffee
damn onions
 
Mr.Coffee's Avatar
 
Join Date: Mar 2006
Exp:
Default

....poor bunk...
Mr.Coffee is offline   Reply With Quote
Old 06-09-2013, 01:13 PM   #454
GGG
Franchise Player
 
GGG's Avatar
 
Join Date: Aug 2008
Location: California
Exp:
Default

Quote:
Originally Posted by Rudee View Post
Getting on Macleod trail via 162nd ave or James McKevitt Rd is going to be a nightmare once the additional 1700 new homes get built in Shawnee. I'm in Evergreen Estates and this new development will effect all the other adjacent communities. Not a happy camper.
You really just need to build the SW portion of the Ring Road and it alleviates a lot of the congestion at 162nd and McLeod. Even just finishing the connection at 162nd and 37th st to allow easy access to Anderson and 14th would help.

They also need to fix the logic at the train crossing to function intelligently instead of doing a full advanced left cycle after every train crossing.

Also they need to realign the which lanes turn North bound onto Mcleod. Instead of having a dedicated right turn lane on 162nd to south bound Mcleod they need to have the left lane be forced to turn NB onto Mcleod, the center lane having the option to turn left of go straight and the right lane have the option to go straight or turn right.

Also during rush hour they should not allow traffic on Shawville bvld to turn left or go straight through 162nd. Force all the traffic back to Shawville way if you want to make a left turn.

These things would fix a lot of the issues at that intersection.
GGG is offline   Reply With Quote
Old 06-09-2013, 07:03 PM   #455
RedMileDJ
Lifetime Suspension
 
Join Date: Sep 2007
Location: blow me
Exp:
Default

Quote:
Originally Posted by CaptainYooh View Post
I assume you're asking about the SW connection.

I had a chance to ask Nenshi this question personally at an event he was attending earler this year. His answer was: "by 2017 for sure, based on where things are."

Minister McIver was not so sure, when I asked him the same question, unfortunately.
No, I meant the SE part. The Indians will drag this out for another 50 years. The SW part of the ring road won't be done in my lifetime.


Quote:
Originally Posted by Brannigans Law View Post
I just googled it and a news story says it's on schedule and budget for October finish. From 17th ave to 22x that is. This will be great for people wanting to visit friends and family on opposite ends of the city (Royal Oak to Auburn Bay for instance)
Thank you.
RedMileDJ is offline   Reply With Quote
Old 06-09-2013, 08:00 PM   #456
tvp2003
Franchise Player
 
tvp2003's Avatar
 
Join Date: Mar 2006
Exp:
Default

How come the HOV lane down the Centre Street bridge isn't enforced? Has it ever been? Will it ever be?
tvp2003 is offline   Reply With Quote
Old 06-09-2013, 08:01 PM   #457
BigNumbers
Powerplay Quarterback
 
BigNumbers's Avatar
 
Join Date: Jan 2013
Exp:
Default

Now that the indians have built an addition onto the casino, the city should bulldoze the connector to 37th street and leave a contract pinned to their gate - Time to play hardball.
BigNumbers is offline   Reply With Quote
Old 06-09-2013, 08:15 PM   #458
Slava
Franchise Player
 
Join Date: Dec 2006
Location: Calgary, Alberta
Exp:
Default

Quote:
Originally Posted by GGG View Post
You really just need to build the SW portion of the Ring Road and it alleviates a lot of the congestion at 162nd and McLeod. Even just finishing the connection at 162nd and 37th st to allow easy access to Anderson and 14th would help.

They also need to fix the logic at the train crossing to function intelligently instead of doing a full advanced left cycle after every train crossing.

Also they need to realign the which lanes turn North bound onto Mcleod. Instead of having a dedicated right turn lane on 162nd to south bound Mcleod they need to have the left lane be forced to turn NB onto Mcleod, the center lane having the option to turn left of go straight and the right lane have the option to go straight or turn right.

Also during rush hour they should not allow traffic on Shawville bvld to turn left or go straight through 162nd. Force all the traffic back to Shawville way if you want to make a left turn.

These things would fix a lot of the issues at that intersection.
This stuff might help, but I'm not totally sure about some of what you say here actually, so I don't know if I agree. Realistically though we need an overpass at 162 and MacLeod. Not much else will make that better completely, and I doubt the cash is there at this point, let alone the political will.

The other fix is one where the ship has sailed; connecting 14th street over Fish Creek and into Evergreen (I think it would lineup to Evergreen Street, but I'm not sure). That likely won't happen, but clearly should. The deep south has no way out other than MacLeod. Thankfully the closing of the left hand turn lanes at Lake Fraser Gate has helped, but even getting that done was like pulling teeth!
Slava is offline   Reply With Quote
Old 06-09-2013, 08:26 PM   #459
jayswin
Celebrated Square Root Day
 
jayswin's Avatar
 
Join Date: Mar 2006
Exp:
Default

Quote:
Originally Posted by Red-Mile-DJ View Post
No, I meant the SE part. The Indians will drag this out for another 50 years. The SW part of the ring road won't be done in my lifetime.
Quote:
Originally Posted by BigNumbers View Post
Now that the indians have built an addition onto the casino, the city should bulldoze the connector to 37th street and leave a contract pinned to their gate - Time to play hardball.
I can tell by your guys' posts that you're not happy with the Natives, but let's not get racist all up in here.
jayswin is offline   Reply With Quote
Old 06-09-2013, 08:31 PM   #460
MelBridgeman
Lifetime Suspension
 
Join Date: Mar 2007
Location: Calgary
Exp:
Default

Quote:
Originally Posted by flameswin View Post
I can tell by your guys' posts that you're not happy with the Natives, but let's not get racist all up in here.
Is the bolded part the racist part?
MelBridgeman is offline   Reply With Quote
Reply

Tags
ask me anything , nenshiisashill , purple


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -6. The time now is 04:39 PM.

Calgary Flames
2024-25




Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright Calgarypuck 2021 | See Our Privacy Policy