Old 08-14-2012, 05:41 PM   #721
Lil Pedro
First Line Centre
 
Lil Pedro's Avatar
 
Join Date: Jan 2009
Location: Calgary
Exp:
Default

Is it still scheduled to open December 12, 2012? Or will it be in early 2013 as the test train has indicated?

Last edited by Lil Pedro; 08-15-2012 at 12:29 AM.
Lil Pedro is offline   Reply With Quote
Old 08-14-2012, 11:10 PM   #722
frinkprof
First Line Centre
 
frinkprof's Avatar
 
Join Date: Dec 2009
Exp:
Default

Quote:
Originally Posted by Lil Pedro View Post
Is it still scheduled to open December 12, 2012? Or will it be in early 2013 as the test train as indicated?
Officially it is March 2013, but my guess is that it will indeed open as originally scheduled on December 10th, 2012. There's a few X factors that I don't have the best idea of whether they will keep that from happening, but the line looks substantially complete. Most of the stations are pretty well done (Westbrook seems a bit behind the rest, based on photos), LRV testing has been ongoing for awhile now, the existing 10th Street Station closes in early September, which will allow enough time to demolish it and finish Kerby Station so it can open by December, etc.

Hard to know with a few things like electrical.

With a full four months before the originally planned opening date, I could certainly see it happening.

Last edited by frinkprof; 08-14-2012 at 11:13 PM.
frinkprof is online now   Reply With Quote
Old 08-15-2012, 03:09 PM   #723
KelVarnsen
Franchise Player
 
KelVarnsen's Avatar
 
Join Date: Jul 2010
Location: Apartment 5A
Exp:
Default

How did they get the test train on the new tracks? Doesn't the 10 street station have a concrete barrier at the end of it?
KelVarnsen is offline   Reply With Quote
Old 08-15-2012, 03:16 PM   #724
You Need a Thneed
Voted for Kodos
 
You Need a Thneed's Avatar
 
Join Date: Dec 2007
Exp:
Default

Quote:
Originally Posted by KelVarnsen View Post
How did they get the test train on the new tracks? Doesn't the 10 street station have a concrete barrier at the end of it?
The north (future westbound) track has been connected to the existing system. The south track must wait until the 10th Street Platform is removed. From fall until the opening of the WLRT the LRT will turn around without a platform. Passengers will have to get off at 7th Street or 8th Street.
You Need a Thneed is offline   Reply With Quote
Old 08-15-2012, 09:15 PM   #725
stevinder
Backup Goalie
 
stevinder's Avatar
 
Join Date: Sep 2010
Location: Killarney (Calgary)
Exp:
Default

Quote:
Originally Posted by KelVarnsen View Post
How did they get the test train on the new tracks? Doesn't the 10 street station have a concrete barrier at the end of it?
The end of the track was removed a few months back.


WLRT-08122012-17 by srp775, on Flickr
__________________
Steve P.

Last edited by stevinder; 08-15-2012 at 09:35 PM.
stevinder is offline   Reply With Quote
The Following User Says Thank You to stevinder For This Useful Post:
Old 08-27-2012, 04:52 PM   #726
You Need a Thneed
Voted for Kodos
 
You Need a Thneed's Avatar
 
Join Date: Dec 2007
Exp:
Default

City says WLRT could open up before Christmas:

Link.
You Need a Thneed is offline   Reply With Quote
Old 08-27-2012, 05:17 PM   #727
iggy_oi
Franchise Player
 
iggy_oi's Avatar
 
Join Date: Nov 2007
Exp:
Default

This has probably been brought up in this thread but I'm too lazy to go through the 37 pages. Does anyone know how the new train lines will work once the new west line is done? Will it be a nw to south and west to ne or will it be nw to ne and south to west?
iggy_oi is online now   Reply With Quote
Old 08-27-2012, 05:23 PM   #728
You Need a Thneed
Voted for Kodos
 
You Need a Thneed's Avatar
 
Join Date: Dec 2007
Exp:
Default

The S - NW line will remain as is. The NE line will continue on to 69th St instead of 10th street.
You Need a Thneed is offline   Reply With Quote
The Following User Says Thank You to You Need a Thneed For This Useful Post:
Old 08-28-2012, 12:04 PM   #729
Jordan!
Jordan!
 
Jordan!'s Avatar
 
Join Date: Jul 2009
Location: Chandler, AZ
Exp:
Default

Crazy..
Jordan! is offline   Reply With Quote
Old 09-23-2012, 09:44 PM   #730
stevinder
Backup Goalie
 
stevinder's Avatar
 
Join Date: Sep 2010
Location: Killarney (Calgary)
Exp:
Default

A few West LRT related shots from my walk this afternoon:

Old sidewalks removed along 17th Ave and 33rd St SW. Hopefully, the ugly-ass and crooked former trolley poles will be removed as well.


WLRT-09232012-1 by srp775, on Flickr

More finishing work on Westbrook Centre.


WLRT-09232012-3 by srp775, on Flickr

New alignment for Bow Trail. The lack of a fence in the median is an accident waiting to happen. During construction, people have been jaywalking across Bow Trail inspite of the existing overpass. :shrug:


WLRT-09232012-6 by srp775, on Flickr

4-LRV Train dwelling at Sunalta. I missed getting a shot of a moving train on the guideway by a few seconds. The damn thing was too quiet!

WLRT-09232012-8 by srp775, on Flickr
__________________
Steve P.
stevinder is offline   Reply With Quote
The Following 6 Users Say Thank You to stevinder For This Useful Post:
Old 09-30-2012, 02:34 PM   #731
frinkprof
First Line Centre
 
frinkprof's Avatar
 
Join Date: Dec 2009
Exp:
Default

On October 8th, all of the buses that had been terminating at the Sirocco Park and Ride temporary bus loop during construction will switch back to using the 69th Street Station bus loop.

Many of these changes will only last a couple of months of course, until West LRT opens for service on December 10th. After that, the permanent bus network will come into effect.

http://www.calgarytransit.com/pdf/Si...ider-Guide.pdf
frinkprof is online now   Reply With Quote
The Following User Says Thank You to frinkprof For This Useful Post:
Old 10-01-2012, 03:07 PM   #732
Ducay
Franchise Player
 
Ducay's Avatar
 
Join Date: Feb 2006
Exp:
Default

Anyone know what alignment change on EB Bow Trail @ Crowchild underpass has caused the hellish traffic on Friday/Today (monday)?

The offramp to 10th Ave/Crowchild is backed up all the to Westbrook mall, which takes an entire lane for Bow out of commission.....
Ducay is offline   Reply With Quote
Old 10-01-2012, 04:03 PM   #733
Ozy_Flame

Posted the 6 millionth post!
 
Ozy_Flame's Avatar
 
Join Date: Feb 2002
Exp:
Default

^^ Not entirely sure, but EB Bow Trail @ Crowchild is undergoing a lane addition to accomodate higher volumes of traffic. Essentially they're taking a merging line and extending it to make it an actual lane. Merging from Crowchild onto EB Bow Trail will be made into a smaller circle / shorter merge path I believe.
Ozy_Flame is offline   Reply With Quote
Old 10-01-2012, 04:49 PM   #734
mrgreen
Farm Team Player
 
Join Date: Oct 2009
Location: Calgary
Exp:
Default

Quote:
Originally Posted by stevinder View Post
The lack of a fence in the median is an accident waiting to happen. During construction, people have been jaywalking across Bow Trail inspite of the existing overpass. :shrug:
Yep. I've seen lots of people jaywalking across Bow here. The really dangerous part is the idiot drivers in front of me who've stopped dead in live traffic forcing people to slam on brakes behind them because they think they need to let the jaywalkers cross. Insane!
mrgreen is offline   Reply With Quote
Old 10-01-2012, 05:03 PM   #735
Ozy_Flame

Posted the 6 millionth post!
 
Ozy_Flame's Avatar
 
Join Date: Feb 2002
Exp:
Default

^ Kids are always jaywalking and playing on the street there. This is an incredibly dangerous area of the road. They've put up temporary fencing, but people just knock it down.
Ozy_Flame is offline   Reply With Quote
Old 10-02-2012, 01:58 PM   #736
Ducay
Franchise Player
 
Ducay's Avatar
 
Join Date: Feb 2006
Exp:
Default

I still don't get how the 10th Ave connector from EB Bow can go from smooth sailing one day, to a 100 car lineup, overnight.
That and those ridiculous pedestrian lights on Bow (seriously, the worst invention ever), are my only major hates on that whole corridor.
Ducay is offline   Reply With Quote
Old 10-02-2012, 02:29 PM   #737
FurnaceFace
Franchise Player
 
FurnaceFace's Avatar
 
Join Date: Sep 2005
Location: 110
Exp:
Default

Anyone have a firm handle on what's going in the Westbrook office building above the station? I've heard rumours of the library and clinic that are in Spruce Cliff moving there but have never heard anything confirmed.
__________________
FurnaceFace is offline   Reply With Quote
Old 10-02-2012, 02:51 PM   #738
Ashartus
First Line Centre
 
Join Date: Mar 2007
Location: Calgary
Exp:
Default

Quote:
Originally Posted by Ducay View Post
Anyone know what alignment change on EB Bow Trail @ Crowchild underpass has caused the hellish traffic on Friday/Today (monday)?

The offramp to 10th Ave/Crowchild is backed up all the to Westbrook mall, which takes an entire lane for Bow out of commission.....
Further to Ozy_Flame's answer, right now they've got one lane dug up on 10th Ave. The exit from Bow Trail onto 10th used to be a "free flow" but now that there's only one lane there's a yield, with a lot of oncoming traffic. So cars trying to get onto 10th Ave are basically getting stuck waiting for an opening instead of just being able to go. The torn up pavement is probably about 5 m x 2 m but adds about 10 minutes to my commute.
Ashartus is offline   Reply With Quote
Old 10-02-2012, 02:57 PM   #739
Ozy_Flame

Posted the 6 millionth post!
 
Ozy_Flame's Avatar
 
Join Date: Feb 2002
Exp:
Default

^^ EB on 10th ave coming from southbound Crowchild is also down to one late, bringing it to a proper merge, not a second lane for Bow Trail exiters. Part of the problem right there too.
Ozy_Flame is offline   Reply With Quote
Old 10-02-2012, 03:39 PM   #740
Ducay
Franchise Player
 
Ducay's Avatar
 
Join Date: Feb 2006
Exp:
Default

So are these restrictions on 10th Ave temporary, or is it part of its final alignment?
From what I gather it sounds like its part of the temporary concrete work scheduled for last Saturday (29th)
Ducay is offline   Reply With Quote
Reply


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -6. The time now is 10:44 AM.

Calgary Flames
2024-25




Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright Calgarypuck 2021 | See Our Privacy Policy