Once that temporary bridge is removed... man, gonna be sweet.
|
|
|
The Following User Says Thank You to MrMastodonFarm For This Useful Post:
|
|
11-27-2011, 08:07 PM
|
#1482
|
Franchise Player
Join Date: Nov 2003
Location: Calgary, AB
|
$25 Million is an insignificant amount of money for a piece of infrastructure which will likely be an iconic piece of Calgary for years to come.
I LOVE IT
|
|
|
The Following 2 Users Say Thank You to Tyler For This Useful Post:
|
|
11-27-2011, 08:08 PM
|
#1483
|
Lifetime Suspension
Join Date: Mar 2010
Location: Easter back on in Vancouver
|
Can we change the title to "New Pedestrian Bridge To Be Crappy...Like The Flames.."
|
|
|
11-27-2011, 08:10 PM
|
#1484
|
Franchise Player
Join Date: Apr 2008
Location: Calgary
|
Unlike the Flames the bridge has gotten better under "rebuilding".
|
|
|
11-27-2011, 08:14 PM
|
#1485
|
Franchise Player
|
Hopefully once that temp bridge is removed people will realize how incredibly ridiculously amazingly awesome the design is; based solely on the fact that it can span the entire thing without piers and not be a gigantic cable/arch suspension bridge.
|
|
|
The Following User Says Thank You to Ducay For This Useful Post:
|
|
11-27-2011, 08:16 PM
|
#1486
|
Franchise Player
|
It would be awesome if for once a city project could come in under budget.....I personally think they lowball the initial price and once it is too late the real price comes out.....
|
|
|
11-27-2011, 08:22 PM
|
#1487
|
Lifetime Suspension
|
Quote:
Originally Posted by Ducay
Hopefully once that temp bridge is removed people will realize how incredibly ridiculously amazingly awesome the design is; based solely on the fact that it can span the entire thing without piers and not be a gigantic cable/arch suspension bridge.
|
I bet there are a whole slew of people out there who think that temporary construction bridge is part of the final design, and have no idea it's going to be removed.
|
|
|
The Following 2 Users Say Thank You to MrMastodonFarm For This Useful Post:
|
|
11-29-2011, 12:04 PM
|
#1488
|
Franchise Player
Join Date: Apr 2008
Location: Calgary
|
The final move is supposed to start today:
Quote:
Originally Posted by Druh Farrell
Peace Bridge being prepared for the launch (must be perfectly parallel) & may commence later today. Expected to take 5 to 6 hours
|
|
|
|
11-29-2011, 12:15 PM
|
#1489
|
Playboy Mansion Poolboy
Join Date: Apr 2004
Location: Close enough to make a beer run during a TV timeout
|
OK, now I'm mad. We spent $25M on a bridge; and now they want it to be parallel? Nobody will be able to use it if it's parallel; never mind that I don't see how it won't fall into the water.
|
|
|
The Following 6 Users Say Thank You to ken0042 For This Useful Post:
|
|
11-29-2011, 12:24 PM
|
#1490
|
Franchise Player
Join Date: Sep 2008
Location: Calgary
|
Quote:
Originally Posted by Bigtime
The final move is supposed to start today:
|
Please don't fall into the river. I don't want to see the "Rick Bell Weir".
|
|
|
11-29-2011, 01:02 PM
|
#1491
|
My face is a bum!
|
Quote:
Originally Posted by Bigtime
The final move is supposed to start today:
|
I'm getting some final movement just thinking about it.
|
|
|
11-30-2011, 09:00 AM
|
#1492
|
First Line Centre
|
Thanks for another good pic.
I think with the temp bridge it actually looks like an incredibly cool LRT train going over a bridge.
Quote:
Originally Posted by Regulator75
|
|
|
|
11-30-2011, 09:04 AM
|
#1493
|
Franchise Player
Join Date: Apr 2008
Location: Calgary
|
Drove by it last night, looks like the move didn't happen as it was still over the temporary bridge.
|
|
|
11-30-2011, 09:10 AM
|
#1494
|
Franchise Player
|
Quote:
Originally Posted by Bigtime
The final move is supposed to start today:
|
Quote:
Originally Posted by Druh Farrell
Peace Bridge being prepared for the launch (must be perfectly parallel) & may commence later today. Expected to take 5 to 6 hours
|
I'm pretty certain Druh thinks it's a spaceship.
|
|
|
The Following 3 Users Say Thank You to Madman For This Useful Post:
|
|
12-01-2011, 12:35 PM
|
#1495
|
Franchise Player
Join Date: Apr 2008
Location: Calgary
|
Druh just tweeted that the lateral move is complete. Condolences to all those that were hoping it would fall into the river during this.
|
|
|
The Following User Says Thank You to Bigtime For This Useful Post:
|
|
12-01-2011, 12:53 PM
|
#1496
|
Powerplay Quarterback
|
Quote:
Originally Posted by Bigtime
Druh just tweeted that the lateral move is complete. Condolences to all those that were hoping it would fall into the river during this.
|
So where is our pic then?
|
|
|
12-01-2011, 12:57 PM
|
#1497
|
Franchise Player
Join Date: Apr 2008
Location: Calgary
|
Haven't seen one on the interwebs yet.
|
|
|
12-01-2011, 01:32 PM
|
#1498
|
Franchise Player
Join Date: Dec 2006
Location: Calgary, Alberta
|
Maybe you need an underwater camera?
|
|
|
12-01-2011, 02:16 PM
|
#1499
|
evil of fart
|
Quote:
Originally Posted by Slava
Maybe you need an underwater camera?
|
OMG an underwater bridge would have been so badass.
|
|
|
12-01-2011, 05:00 PM
|
#1500
|
Franchise Player
Join Date: Jun 2006
Location: Calgary, Alberta
|
Quote:
Originally Posted by Sliver
OMG an underwater bridge would have been so badass.
|
Paging Nenshi.
|
|
|
Posting Rules
|
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts
HTML code is Off
|
|
|
All times are GMT -6. The time now is 06:35 AM.
|
|