Old 06-16-2010, 12:38 PM   #561
csnarpy
First Line Centre
 
csnarpy's Avatar
 
Join Date: Feb 2006
Location: Locked in the Trunk of a Car
Exp:
Default

Quote:
Originally Posted by Resolute 14 View Post
In exchange for 400 ha of land, the various levels of government offered $275 million cash, 2000 ha of land on the NW border of the reserve and infrastructure upgrades that pushed the overall value to the band to over $500 million.

http://www.calgaryherald.com/Tsuu+re...512/story.html

I'd really like to know when they will get the SE leg going. I seem to be hitting too many big, slow trucks when I cut down 84st between 17 and 114 avenues.

Havn't they started? I believe the start date was in May...?

Quote:
Chinook Roads Partnership will start construction in May 2010 and the road will open to traffic by the fall of 2013.
http://www.alberta.ca/acn/201004/281...6BB157036.html

Last edited by csnarpy; 06-16-2010 at 12:40 PM.
csnarpy is offline   Reply With Quote
Old 06-16-2010, 12:40 PM   #562
Resolute 14
In the Sin Bin
 
Resolute 14's Avatar
 
Join Date: Jan 2003
Exp:
Default

They must be working in the middle then, as there is no signs of work at 17 or 114 ave. I should head down the 22x one day to see if they started there. Looks like the 52 st twinning is the priority right now.
Resolute 14 is offline   Reply With Quote
Old 06-16-2010, 12:41 PM   #563
Chump
Backup Goalie
 
Join Date: Mar 2008
Exp:
Default

Quote:
Originally Posted by csnarpy View Post
Havn't they started? I believe the start date was in May...?

http://www.alberta.ca/acn/201004/281...6BB157036.html

They haven't started the portion between 17th and Glenmore but I am not sure about the rest.
Chump is offline   Reply With Quote
Old 06-16-2010, 12:47 PM   #564
ken0042
Playboy Mansion Poolboy
 
ken0042's Avatar
 
Join Date: Apr 2004
Location: Close enough to make a beer run during a TV timeout
Exp:
Default

Quote:
Originally Posted by Resolute 14 View Post
I'd really like to know when they will get the SE leg going. I seem to be hitting too many big, slow trucks when I cut down 84st between 17 and 114 avenues.
Quote:
Originally Posted by csnarpy View Post
Havn't they started? I believe the start date was in May...?
It's really a shame that nobody bumped this thread to indicate when all the details of the SE leg are going to be made public.
ken0042 is offline   Reply With Quote
Old 06-16-2010, 12:47 PM   #565
Resolute 14
In the Sin Bin
 
Resolute 14's Avatar
 
Join Date: Jan 2003
Exp:
Default

Speaking of ring roads, I noticed last weekend that they are going to town on the Anthony Henday in Edmonton. There is bridge construction at Rabbit Hill Road, Collingwood, Lessard, Stony Plain Road and this insane 5-7 bridge interchange at Yellowhead going up just west of the existing bridge structure. With the Grande Prairie bypass also nearing completion, you'll soon be able to drive from Claresholm to Dawson Creek without seeing a single traffic light.
Resolute 14 is offline   Reply With Quote
Old 06-16-2010, 12:50 PM   #566
Resolute 14
In the Sin Bin
 
Resolute 14's Avatar
 
Join Date: Jan 2003
Exp:
Default

Quote:
Originally Posted by ken0042 View Post
It's really a shame that nobody bumped this thread to indicate when all the details of the SE leg are going to be made public.
Given the province said it was supposed to start over a month ago, I'm surprised we are back at public consultation again.
Resolute 14 is offline   Reply With Quote
Old 06-16-2010, 01:06 PM   #567
ken0042
Playboy Mansion Poolboy
 
ken0042's Avatar
 
Join Date: Apr 2004
Location: Close enough to make a beer run during a TV timeout
Exp:
Default

I don't think this is about consultation. I'm pretty sure it's a "this is how things are going to be; and you are going to like it" session.
ken0042 is offline   Reply With Quote
Old 06-16-2010, 01:19 PM   #568
Mazrim
CP Gamemaster
 
Mazrim's Avatar
 
Join Date: Feb 2010
Location: The Gary
Exp:
Default

They had the exact same public information session for the NE portion. They held it shortly after construction started and it did result in some access changes being made.
Mazrim is offline   Reply With Quote
Old 06-16-2010, 06:58 PM   #569
ken0042
Playboy Mansion Poolboy
 
ken0042's Avatar
 
Join Date: Apr 2004
Location: Close enough to make a beer run during a TV timeout
Exp:
Default

So, just came back from the info session. A few key points I took from it:

- Work has started along 22X. Most of it is surveying and staging work so far.
- The interchanges along 22X will be started first. Partially due to them taking longer as they have to allow for current traffic, and partly because the benefit will be seen sooner.
- Those of us living along 22X- it doesn't look like we are going to see much in the way of better noise barriers.
- While MacLeod Trail isn't part of this project, they expect to have that interchange improved before the SE leg of Stoney Trail opens.
- There are apparently better maps as of today on the Province's website outlining some of the exact details.
ken0042 is offline   Reply With Quote
The Following 8 Users Say Thank You to ken0042 For This Useful Post:
Old 06-16-2010, 09:54 PM   #570
4X4
One of the Nine
 
Join Date: Dec 2004
Exp:
Default

Quote:
Originally Posted by ken0042 View Post
- While MacLeod Trail isn't part of this project, they expect to have that interchange improved before the SE leg of Stoney Trail opens.
Never really thought of that. That is a pretty piss-poor interchange. So by "expect", they mean that they don't have an actual plan for that interchange yet? If they do, I'd love to see it.
4X4 is offline   Reply With Quote
Old 06-17-2010, 08:01 AM   #571
ken0042
Playboy Mansion Poolboy
 
ken0042's Avatar
 
Join Date: Apr 2004
Location: Close enough to make a beer run during a TV timeout
Exp:
Default

There is no plan designed yet as they are still discussing it with the city; as MacLeod in the city's responsibility. But I was speaking to the main guy at Alberta Infrastructure and he assured me it has to be done before the SE leg opens.

I think part of the reason it remains so bad is the province really thought the Tsuu T'ina deal would go through; and that would have meant the announcement of both SE and SW legs starting around the same time. That would have allowed MacLeod to be the first improvement.
ken0042 is offline   Reply With Quote
Old 06-17-2010, 08:10 AM   #572
Rathji
Franchise Player
 
Rathji's Avatar
 
Join Date: Nov 2006
Location: Supporting Urban Sprawl
Exp:
Default

Quote:
Originally Posted by ken0042 View Post
- Those of us living along 22X- it doesn't look like we are going to see much in the way of better noise barriers.
I live a few houses away from 22x behind the berm in Mackenzie towne and never hear much from 22x other than a very occasional use of jack brakes.

I wonder if it will get bad enough that I might notice it.
__________________
"Wake up, Luigi! The only time plumbers sleep on the job is when we're working by the hour."
Rathji is offline   Reply With Quote
Old 06-17-2010, 08:17 AM   #573
ken0042
Playboy Mansion Poolboy
 
ken0042's Avatar
 
Join Date: Apr 2004
Location: Close enough to make a beer run during a TV timeout
Exp:
Default

I think that's the key Rathji- by the time the Trucks are near you they are already past one set of lights, so the truckers are into "city driving" mode. However in Copperfield I hear them all the time as my part of 22X is still un-lit highway and truckers haven't had a stop in dozens of kilometres.

I also think that once it's an expressway without traffic lights there will be less need for them to brake.
ken0042 is offline   Reply With Quote
Old 06-17-2010, 08:53 AM   #574
You Need a Thneed
Voted for Kodos
 
You Need a Thneed's Avatar
 
Join Date: Dec 2007
Exp:
Default

Quote:
Originally Posted by 4X4 View Post
Never really thought of that. That is a pretty piss-poor interchange. So by "expect", they mean that they don't have an actual plan for that interchange yet? If they do, I'd love to see it.
Here's the functional plan for that interchange,
You Need a Thneed is offline   Reply With Quote
The Following User Says Thank You to You Need a Thneed For This Useful Post:
4X4
Old 06-17-2010, 12:50 PM   #575
4X4
One of the Nine
 
Join Date: Dec 2004
Exp:
Default

Quote:
Originally Posted by You Need a Thneed View Post
WDF

Are they trying to see how many individual bridges they can cram into this thing?
4X4 is offline   Reply With Quote
Old 06-17-2010, 01:17 PM   #576
Madman
Franchise Player
 
Madman's Avatar
 
Join Date: Mar 2004
Exp:
Default

Quote:
Originally Posted by 4X4 View Post
WDF

Are they trying to see how many individual bridges they can cram into this thing?
Yeah, those engineering types sure love their flyovers.
Madman is offline   Reply With Quote
Old 06-17-2010, 01:58 PM   #577
You Need a Thneed
Voted for Kodos
 
You Need a Thneed's Avatar
 
Join Date: Dec 2007
Exp:
Default

That's how these freeway to freeway interchanges have to be built though.
You Need a Thneed is offline   Reply With Quote
Old 06-25-2010, 01:06 PM   #578
BurningYears
First Line Centre
 
BurningYears's Avatar
 
Join Date: Aug 2009
Location: Sector 7G
Exp:
Default

http://www.sestproject.ca/
not sure if this link has been put up yet anywhere but has some nice maps of the ring road overlayed on a satellite picture. Deerfoot and Stoney Tr south seems to be mayhem haha.
__________________
The Oilers are like a buffet with one tray of off-brand mac-and-cheese and the rest of it is weird Jell-O
BurningYears is offline   Reply With Quote
Old 06-25-2010, 01:16 PM   #579
Jayems
Franchise Player
 
Join Date: Aug 2005
Location: Calgary
Exp:
Default

I'm confused. Are they putting an interchange at 130th or not?

Some say no, others say yes. I'm assuming it is in the plans for the future.

Quote:
130 Avenue SE:

  • No construction activity anticipated until August 2012
  • This is grading work for an interchange to be built once the future alignment of 130 Avenue SE is completed by the City of Calgary
Jayems is offline   Reply With Quote
Old 12-12-2010, 12:57 PM   #580
ken0042
Playboy Mansion Poolboy
 
ken0042's Avatar
 
Join Date: Apr 2004
Location: Close enough to make a beer run during a TV timeout
Exp:
Default

Just a bump to mention there is another SE Ring Road open house Monday at McKenzie Towne Church. There is a sign on 52nd and Copperfield gate, but I think it starts at 5:00 and goes to 8 or 9.
ken0042 is offline   Reply With Quote
Reply


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -6. The time now is 09:37 AM.

Calgary Flames
2024-25




Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright Calgarypuck 2021 | See Our Privacy Policy