View Poll Results: When will the ring road be completed?
1-3 years 8 3.85%
4-7 years 91 43.75%
7-10 years 65 31.25%
10-20 years 20 9.62%
Never 24 11.54%
Voters: 208. You may not vote on this poll

Reply
 
Thread Tools Search this Thread
Old 10-20-2013, 12:40 PM   #1621
Resolute 14
In the Sin Bin
 
Resolute 14's Avatar
 
Join Date: Jan 2003
Exp:
Default

True, but Airport Trail was constructed around 2000, and I can't imagine they failed to consider a westward extension before then.
Resolute 14 is offline   Reply With Quote
Old 10-20-2013, 01:45 PM   #1622
psicodude
First Line Centre
 
psicodude's Avatar
 
Join Date: Nov 2006
Location: Calgary
Exp:
Default

Anyone know where to find out if Deerfoot will still be down to one lane by the afternoon rush tomorrow? I just need to know if I am taking Macleod or not.
psicodude is offline   Reply With Quote
Old 10-20-2013, 01:54 PM   #1623
Acey
Franchise Player
 
Join Date: Nov 2009
Location: Calgary
Exp:
Default

I emailed them because I have to go south tomorrrow, too... seems since they're past the due date they said "F it" with the traffic advisories and haven't posted anything on their website. I bet if we made enough of a stink we could get them fined because the contract states they have to:

Quote:
Implement traffic accommodation measures (e.g., detours, local access relocations and signage, along with public information and notices) to minimize effects on traffic congestion and maintain traffic flow.... [blah blah 400 more pages of stuff]
At no point is shutting down Deerfoot Trail NOT something you can get away with not releasing a press release for. If I get a response, I'll post it in this thread as soon as I get it.
Acey is offline   Reply With Quote
Old 10-20-2013, 01:56 PM   #1624
psicodude
First Line Centre
 
psicodude's Avatar
 
Join Date: Nov 2006
Location: Calgary
Exp:
Default

Thanks, and let us know how to help. This is day 3 of Deerfoot SB being backed up past McKenzie Towne. The deep SE will be gridlocked tomorrow if they don't open more lanes up.
psicodude is offline   Reply With Quote
Old 10-20-2013, 02:44 PM   #1625
You Need a Thneed
Voted for Kodos
 
You Need a Thneed's Avatar
 
Join Date: Dec 2007
Exp:
Default

I'm just wondering when 11th St NE will be connected to Beddington.
You Need a Thneed is offline   Reply With Quote
The Following User Says Thank You to You Need a Thneed For This Useful Post:
Old 10-20-2013, 02:55 PM   #1626
getbak
Franchise Player
 
getbak's Avatar
 
Join Date: Feb 2006
Location: Calgary, AB
Exp:
Default

Quote:
Originally Posted by psicodude View Post
Thanks, and let us know how to help. This is day 3 of Deerfoot SB being backed up past McKenzie Towne. The deep SE will be gridlocked tomorrow if they don't open more lanes up.
It's a conspiracy by the latte-sipping inner-city elite at Silly Hall to keep you from voting.
__________________
Turn up the good, turn down the suck!
getbak is offline   Reply With Quote
The Following User Says Thank You to getbak For This Useful Post:
Old 10-20-2013, 07:29 PM   #1627
5seconds
Draft Pick
 
Join Date: Nov 2012
Default

Quote:
Originally Posted by ken0042 View Post
So here's the question- was 96 ave/ Airport trail planned back in the early 90s when the Beddington Trail interchange was built?
96th ave at Deerfoot was in planning from at least 1980, where it was a partial interchange (no eastward portion towards the airport)

EDIT: I have 2 maps from 1980, one shows a partial interchange and one shows a full interchange with Airport Trail continuing eastwards. I think that since 96th ends only about 2.5km west of Deerfoot in those original plans, it would make more sense if it connected in both directions. In either case, the plan was there pretty early.

Last edited by 5seconds; 10-20-2013 at 07:40 PM.
5seconds is offline   Reply With Quote
The Following 4 Users Say Thank You to 5seconds For This Useful Post:
Old 10-20-2013, 08:14 PM   #1628
Acey
Franchise Player
 
Join Date: Nov 2009
Location: Calgary
Exp:
Default

They gonna tunnel some shizz... that's exciting.



Deerfoot better be 10 lanes with C/D through to Memorial before they even think of trying to justify this.
Acey is offline   Reply With Quote
Old 10-20-2013, 08:21 PM   #1629
getbak
Franchise Player
 
getbak's Avatar
 
Join Date: Feb 2006
Location: Calgary, AB
Exp:
Default

Quote:
Originally Posted by You Need a Thneed View Post
I'm just wondering when 11th St NE will be connected to Beddington.
What are the plans there? I used to work in the area north of Deerfoot Mall, and if there was ever an accident on 64th and Deerfoot, you couldn't get home. Now, there's Aero Drive around to Airport Trail, but a northbound exit via 11th St would be nice.
__________________
Turn up the good, turn down the suck!
getbak is offline   Reply With Quote
Old 10-20-2013, 08:27 PM   #1630
Acey
Franchise Player
 
Join Date: Nov 2009
Location: Calgary
Exp:
Default

Connect it to the Beddington ramp, and also to NB Deerfoot itself after Beddington; it's a no-brainer and would take a huge load off the 64 Ave/Deerfoot interchange and more importantly the NB weave that exists there. Yep, it ranks very highly on the "bang for your buck" list of fixes to Deerfoot.
Acey is offline   Reply With Quote
Old 10-20-2013, 08:32 PM   #1631
getbak
Franchise Player
 
getbak's Avatar
 
Join Date: Feb 2006
Location: Calgary, AB
Exp:
Default

Quote:
Originally Posted by Acey View Post
Connect it to the Beddington ramp, and also to NB Deerfoot itself after Beddington; it's a no-brainer and would take a huge load off the 64 Ave/Deerfoot interchange and more importantly the NB weave that exists there. Yep, it ranks very highly on the "bang for your buck" list of fixes to Deerfoot.
Are there any plans to actually do that anytime soon? That northbound lane that just fades away north of Aero Gate is so disappointing.
__________________
Turn up the good, turn down the suck!
getbak is offline   Reply With Quote
Old 10-21-2013, 12:31 PM   #1632
Acey
Franchise Player
 
Join Date: Nov 2009
Location: Calgary
Exp:
Default

Quote:
Originally Posted by getbak View Post
Are there any plans to actually do that anytime soon? That northbound lane that just fades away north of Aero Gate is so disappointing.
Nothing concrete. They'll do a study, then nothing for a few years, you know the drill.

No news from the province or the contractor on Deerfoot. I'm assuming they're done paving because I have heard anything about it today.
Acey is offline   Reply With Quote
Old 10-21-2013, 12:42 PM   #1633
fundmark19
#1 Goaltender
 
Join Date: May 2009
Exp:
Default

Any updates on how the natives are feeling? The vote is this week and everything still seems very hush hush
fundmark19 is offline   Reply With Quote
Old 10-21-2013, 03:52 PM   #1634
Joborule
Franchise Player
 
Joborule's Avatar
 
Join Date: Jun 2006
Location: Calgary, Alberta
Exp:
Default

If anything, quiet is good news.
Joborule is offline   Reply With Quote
Old 10-21-2013, 04:34 PM   #1635
Acey
Franchise Player
 
Join Date: Nov 2009
Location: Calgary
Exp:
Default

She speaks.

Quote:
Hi Acey,

Thank you for your email. Today [Monday] should be the last day with any major traffic impacts. After today we should only have smaller areas to pave.

Please feel free to contact me if you have any further questions.

Kind regards,

Lindsey

Lindsey Bethke
Communications Advisor
Chinook Roads Partnership
Southeast Stoney Trail Project
Calgary, AB
Acey is offline   Reply With Quote
Old 10-21-2013, 05:00 PM   #1636
jar_e
Franchise Player
 
jar_e's Avatar
 
Join Date: Mar 2006
Exp:
Default

Quote:
Originally Posted by Acey View Post
She speaks.
So that means it opens this week or????????
jar_e is offline   Reply With Quote
Old 10-21-2013, 05:29 PM   #1637
Acey
Franchise Player
 
Join Date: Nov 2009
Location: Calgary
Exp:
Default

Means no such thing. I had asked her (and AB Trans) how much longer SB Deerfoot would be down to one lane for paving, as it caused massive delays all weekend. That was her response, and AB Trans also just replied and said:

Quote:
Thank you for contacting the Government of Alberta [...]

Our southeast Stoney Trail contractor has informed us that the paving activities on Deerfoot will continue for the rest of the week. In general a minimum of two lanes will remain open to the traffic on the main line but with the amount of work being done, it may cause some delays. [..]

Kamran Mirza, M Eng., P. Eng.
Urban Construction Engineer, Calgary
Alberta Transportation
Ph: (403) 801-3712
Acey is offline   Reply With Quote
Old 10-21-2013, 05:37 PM   #1638
BlackArcher101
Such a pretty girl!
 
BlackArcher101's Avatar
 
Join Date: Jan 2004
Location: Calgary
Exp:
Default

LOL. Surprising, no one knows what's going on.
__________________
BlackArcher101 is offline   Reply With Quote
Old 10-21-2013, 05:48 PM   #1639
Acey
Franchise Player
 
Join Date: Nov 2009
Location: Calgary
Exp:
Default

Haha she gave an answer similar to a few I have received in the past, Lindsey "Rose-Coloured Glasses" Bethke you might as well call her. AB Trans has been far more likely to give a realistic answer, at least in my correspondence.
Acey is offline   Reply With Quote
Old 10-21-2013, 06:07 PM   #1640
Northendzone
Franchise Player
 
Northendzone's Avatar
 
Join Date: Aug 2009
Exp:
Default

So open on Monday?
__________________
If I do not come back avenge my death
Northendzone is offline   Reply With Quote
Reply


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -6. The time now is 06:54 PM.

Calgary Flames
2024-25




Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright Calgarypuck 2021 | See Our Privacy Policy