Quote:
Originally Posted by burn_this_city
Maybe do like everyone else did and read the 45 pages. It's been covered numerous times already.
The mayor isn't the dictator of the city managing everything, this stuff is dealt with by the City Administration. Second, you can fall for the noise, but its increasingly looking like the Flames excuses are nonsense and its because of material inflation to the core project. Murray Edwards doesn't want to eat $100MM in project overruns, he slept on the downturn in construction costs to nickle and dime the city.
|
Lol why read 45 pages when i can get a fully non-biased breakdown like that.
Overruns were always expected, and in order to take advantage of the downturn in construction the deal would've had to been signed in 2014 or so.
Just so we're clear, it's the city who's nickle and diming the CSEC right now.