Quote:
Originally Posted by JBR
With CMLC out, it doesn’t necessarily mean that CSEC will be leading the design phase. It would likely mean there will be another PM team to replace them.
|
But one that likely won't be as invested in how the arena fits into the fabric of the surrounding area.