Quote:
Originally Posted by Mazrim
Is it really a whole bunch more? They pre-graded the widening when they built the road, so all they have to do is scrape off the topsoil and put down the asphalt. They'll have to move some small signs around and revise the big green ones, but otherwise everything else should be good to go. I'd love to know why they haven't done it in the NE area yet.
|
There's been traffic jams on Stoney between 17ave SE and 16th Ave NE every single day since it opened because it narrows to two lanes.
Why go through all the trouble of building a freeway, then engineer a bottleneck so you can expand it in the future.