Quote:
Originally Posted by You Need a Thneed
The Nose Hill Drive Interchange is out for tender. It looks like a lot of work - it includes:
Widening the existing Stoney Trail bridge over the CP Rail tracks
A new bridge for the southbound lanes of Stoney Trail over the CP Rail tracks
|
Why would they both widen and add an additional bridge over the tracks?
Are they making it 3 lanes each direction? Does this effect the bridge over the river?