Quote:
Originally Posted by Ducay
I believe it was just the design that didn't go out to tender. I believe the contruction contract (won by Graham) and Structure contract (won by El-Esteel Espania Limitado) went to tender.
There are a few key issues with the bridge and the process behind it, but the majority of opponents to the bridge just use buzzwords and issues pushed by the media hype against it.
|
Yes, the construction contract was tendered. Graham was the lowest bid. The febricator has a contract with Graham.
Again, improper welds do not change the scope of the project, and thus there will not be a change order to cover the cost. I highly HIGHLY doubt that Graham is going to get extra money out of the city.