11-20-2023, 05:04 PM
|
#5021
|
Such a pretty girl!
Join Date: Jan 2004
Location: Calgary
|
Yup, was even a perfectly warm weekend, you'd think they'd try to get as much as they can get done since winter is coming and they are behind the original schedule?
No, just push the schedule and take it easy. Not a single soul in sight. Like god damn, how easy is being a project manager on these things? No accountability to time and seems like costs as well. So just a giant "meh, it'll get done when it gets done, and for however much we spent"
__________________
Last edited by BlackArcher101; 11-20-2023 at 05:07 PM.
|
|
|
11-20-2023, 05:19 PM
|
#5022
|
Powerplay Quarterback
|
Quote:
Originally Posted by BlackArcher101
Why do we let contractors just take their sweet ass time on projects in this city?
|
Pretty sure this “collective workforce” would take so long to mow my lawn, by the time they finished, it would be time to start again. Hmmm, almost like they’re intentionally inefficient. How odd.
|
|
|
11-20-2023, 06:59 PM
|
#5023
|
Franchise Player
Join Date: Aug 2012
Location: Calgary, AB
|
Quote:
Originally Posted by BlackArcher101
Yup, was even a perfectly warm weekend, you'd think they'd try to get as much as they can get done since winter is coming and they are behind the original schedule?
No, just push the schedule and take it easy. Not a single soul in sight. Like god damn, how easy is being a project manager on these things? No accountability to time and seems like costs as well. So just a giant "meh, it'll get done when it gets done, and for however much we spent"
|
I don't know what you do for a living, but I'm pretty damn sure it has nothing to do with infrastructure projects.
SMH.
__________________
It's only game. Why you heff to be mad?
|
|
|
The Following User Says Thank You to DoubleK For This Useful Post:
|
|
11-20-2023, 07:04 PM
|
#5024
|
Such a pretty girl!
Join Date: Jan 2004
Location: Calgary
|
Quote:
Originally Posted by DoubleK
I don't know what you do for a living, but I'm pretty damn sure it has nothing to do with infrastructure projects.
SMH.
|
What part was wrong? Where's the repercussions for this taking embarrassingly long and the piss poor communications about detours?
I'm on the supplier side for muni/industrial projects.
__________________
|
|
|
12-01-2023, 11:17 AM
|
#5025
|
Franchise Player
|
Looks like all the construction signs, speed limit reductions etc. have been removed on the NB portion of Stoney where it crosses the river. It was full speed from WB 16th Ave to NB Stoney. Not sure of SB Stoney is the same, that is not part of my commute normally.
|
|
|
The Following User Says Thank You to Lubicon For This Useful Post:
|
|
12-01-2023, 12:24 PM
|
#5026
|
First Line Centre
|
It's so beautiful and flowing now!
|
|
|
12-01-2023, 12:41 PM
|
#5027
|
Franchise Player
Join Date: Aug 2005
Location: Violating Copyrights
|
No construction updates on the site since Oct 20th. Anyone drive highway 8 often and can estimate the state of the overpasses? North and south of 17th looks glorious. Lit, laned and signed.
|
|
|
12-01-2023, 02:03 PM
|
#5028
|
CP Gamemaster
Join Date: Feb 2010
Location: The Gary
|
Is it still 80km/h on the Trans Canada between Stoney and Old Banff Coach Road? 80 felt so slow last time I drove through there.
|
|
|
12-01-2023, 04:16 PM
|
#5029
|
Franchise Player
|
Quote:
Originally Posted by Mazrim
Is it still 80km/h on the Trans Canada between Stoney and Old Banff Coach Road? 80 felt so slow last time I drove through there.
|
5 lane road. No construction . 80 km/h. Only in Canada.
|
|
|
The Following 5 Users Say Thank You to Weitz For This Useful Post:
|
|
12-01-2023, 04:29 PM
|
#5030
|
First Line Centre
|
Quote:
Originally Posted by Weitz
5 lane road. No construction . 80 km/h. Only in Canada.
|
This. It's so painful. Especially when you come back from a few weeks of driving in Europe. The road is straight, it's wide with multiple lanes, there is a centre divider, and the bushes aren't hitting your mirrors and yet the speed limit is slower!?
On the plus side, nobody drives 80km/hr on that stretch so it's not too bad.
|
|
|
12-01-2023, 04:37 PM
|
#5031
|
Franchise Player
Join Date: Oct 2006
Location: Calgary
|
I was just on there about 20 min ago. Everybody was doing 100 even though....
So it's not too bad.
__________________
Fireside Chat - The #1 Flames Fan Podcast - FiresideChat.ca
|
|
|
12-03-2023, 09:16 AM
|
#5032
|
#1 Goaltender
|
Quote:
Originally Posted by Barnes
No construction updates on the site since Oct 20th. Anyone drive highway 8 often and can estimate the state of the overpasses? North and south of 17th looks glorious. Lit, laned and signed.
|
Drive past it daily, even snuck through one evening heading east on 17th Ave to get onto highway 8. It is done as far as I can tell. More soil grading and work being done off of the road. Some trucks still working the storm pond next to discovery.
|
|
|
12-03-2023, 09:07 PM
|
#5033
|
Scoring Winger
|
When’s the bridge between Cranston and Chaparral supposed to be complete?
|
|
|
12-03-2023, 09:37 PM
|
#5034
|
First Line Centre
Join Date: Oct 2005
Location: 103 104END 106 109 111 117 122 202 203 207 208 216 217 219 221 222 224 225 313 317 HC G
|
Quote:
Originally Posted by The Fisher Account
When’s the bridge between Cranston and Chaparral supposed to be complete?
|
There is no end date provided right now. Once the additional lane is added to the WB bridge, they will need to add another lane to the EB bridge. Once that is done, the WB bridge will need to be repaved, then same again for EB. Then they will announce that instead of construction being complete that the WB bridge will have then exceeded it's life expectancy and will need to torn down and replaced. Then same for EB.
|
|
|
The Following 8 Users Say Thank You to RW99 For This Useful Post:
|
|
12-03-2023, 11:36 PM
|
#5035
|
Franchise Player
|
Quote:
Originally Posted by RW99
There is no end date provided right now. Once the additional lane is added to the WB bridge, they will need to add another lane to the EB bridge. Once that is done, the WB bridge will need to be repaved, then same again for EB. Then they will announce that instead of construction being complete that the WB bridge will have then exceeded it's life expectancy and will need to torn down and replaced. Then same for EB.
|
What a way to run a railroad.
- Bugs Bunny?
|
|
|
The Following User Says Thank You to Manhattanboy For This Useful Post:
|
|
12-04-2023, 02:32 AM
|
#5036
|
Franchise Player
|
Quote:
Originally Posted by Weitz
5 lane road. No construction . 80 km/h. Only in Canada.
|
lol. who goes 80 there? grandmas?
__________________
Peter12 "I'm no Trump fan but he is smarter than most if not everyone in this thread. ”
|
|
|
12-04-2023, 02:21 PM
|
#5037
|
Franchise Player
Join Date: Aug 2005
Location: Violating Copyrights
|
Quote:
Originally Posted by The Fisher Account
When’s the bridge between Cranston and Chaparral supposed to be complete?
|
Thank you for your enquiry into the South Bow River project. The pedestrian bridge has been under construction so long that river has changed course and it no longer spans the Bow River so we are starting over. Construction timelines for the new bridge will be presented geologically in eras and epochs. Stay tuned for more information where we wont be updating the website.
-PCL Construction
|
|
|
The Following 6 Users Say Thank You to Barnes For This Useful Post:
|
|
12-04-2023, 02:57 PM
|
#5038
|
Franchise Player
|
If you want to complain about pedestrian bridges, we have a specific thread for that. Strangely specific, actually.
|
|
|
Thread Tools |
Search this Thread |
|
|
Posting Rules
|
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts
HTML code is Off
|
|
|
All times are GMT -6. The time now is 12:47 AM.
|
|