The funny thing is that the city went through everyone's desired "process" for the second bridge and we got a second rate ripoff of the early work of the designer of the Peace Bridge.
__________________
Quote:
Originally Posted by MisterJoji
Johnny eats garbage and isn’t 100% committed.
|
|
|
|
The Following 3 Users Say Thank You to nik- For This Useful Post:
|
|
01-29-2015, 02:14 PM
|
#82
|
Lifetime Suspension
|
Never understood why people are against sole sourcing a project. When I put new kitchen cabinets in my house recently I saw the work some guy did at a friends, looked at his previous work and went with it. If you found a winner, you go with it.
|
|
|
The Following User Says Thank You to MrMastodonFarm For This Useful Post:
|
|
01-29-2015, 03:08 PM
|
#83
|
Voted for Kodos
|
Did everything go smoothly? no.
There wasn't anything in particular very wrong about the process.
1. Council had previously identified and approved a pedestrian bridge in that location
2. Administration decided to build it, set a budget, and picked a consultant to design it
3. Being a prime location, city decided to hire a top of the line designer. In this case, the architect is also the structural engineer - additional cost of expensive architect is offset by having to hire one less consultant.
4. Budget wasn't exorbitant, barely more than a bare bones structure could possibly have been with the physical contraints of the site.
5. When problems arose, administration decided that delays were more acceptable than budget increases.
6. Final project is beautiful, and came in at budget, or within a few percentage points of it.
7. Council named the bridge a name that aligns with the theme of the area in which it exists. "Memorial Drive" "Poppy Plaza" "Peace Bridge"
Honestly, I don't know how the process gets criticised to the extent that it does.
|
|
|
01-29-2015, 03:13 PM
|
#84
|
#1 Goaltender
|
QC departments are the WORST.
|
|
|
01-29-2015, 04:03 PM
|
#85
|
Franchise Player
|
I'm just curious how they were allowed to sole-source. I'm sure the design pricetag was more than $75,000.
|
|
|
01-29-2015, 04:54 PM
|
#86
|
Lifetime Suspension
|
Quote:
Originally Posted by V
I'm just curious how they were allowed to sole-source. I'm sure the design pricetag was more than $75,000.
|
Why wouldn't they be allowed?
|
|
|
01-29-2015, 05:37 PM
|
#87
|
First Line Centre
|
Quote:
Originally Posted by 4X4
So much bridge hate in this city. It's weird. I think it'd be cool if Calgary developed some kind of bridge fetish, where companies or community associations would sponsor pedestrian bridges all over the city, and they'd try to one up the last one built.
Rome has fountains, Edmonton has mullets, Calgary could have bridges.
|
Pedestrian bridge dick measuring contest. I like it.
|
|
|
The Following User Says Thank You to chalms04 For This Useful Post:
|
|
01-29-2015, 05:48 PM
|
#88
|
I believe in the Pony Power
|
I love the Peace Bridge
But I also love complaining about it.
|
|
|
01-29-2015, 05:52 PM
|
#89
|
Not Taylor
Join Date: Dec 2009
Location: Calgary SW
|
Quote:
Originally Posted by Erick Estrada
The majority of Calgarians didn't want the bridge originally. City hall went ahead against the majority which you can understand would equate to some unhappy people.
|
Did we have a vote? I don't remember being asked my opinion. And even if "the majority of Calgarians" didn't want it, so what? The majority of Calgarians weren't the people who were ever going to use it anyway. I could just as easily say the majority of Calgarians don't want a school in Skyview Ranch, for example. Does that mean it shouldn't be built?
|
|
|
The Following 14 Users Say Thank You to Swift For This Useful Post:
|
Antithesis,
Burninator,
cam_wmh,
CliffFletcher,
corporatejay,
firebug,
Flash Walken,
jayswin,
MrMastodonFarm,
Peanut,
Reaper,
surferguy,
Vulcan,
woob
|
01-29-2015, 05:56 PM
|
#90
|
Franchise Player
Join Date: Jun 2008
Location: Spartanville
|
Quote:
Originally Posted by mrkajz44
For those that don't drive there, the issue is not that the traffic lights are 350m away with a crosswalk. It's the fact that people were not using the crosswalk (no matter how reasonably close it was). There are people running accross lanes of 5 or so lanes of traffic where most people are doing about 80. It was dangerous. And sometimes people on the road stopped (!!) to let the people jaywalk.
I think this is more about cutting down on those incidents than anything else.
|
If I recall correctly from my time living there you forgot to add the 'with shopping carts' part.
|
|
|
01-29-2015, 06:04 PM
|
#91
|
Franchise Player
Join Date: Oct 2010
Location: Calgary
|
So all controversy aside, how are they going to fix this? And for anyone writing contracts like these, what kind of penalties are there for the contractor for screwing up royally like this?
|
|
|
01-29-2015, 07:11 PM
|
#92
|
Voted for Kodos
|
Quote:
Originally Posted by FlameOn
So all controversy aside, how are they going to fix this? And for anyone writing contracts like these, what kind of penalties are there for the contractor for screwing up royally like this?
|
The fix almost certainly is to modify the abutments, probably not a huge task. The big cost is to bring in the crane a second time.
The penalty of not getting paid until it's done and working is usually enough penalty. If the responsible party isn't the party that has to fix the problem, the responsible party will generally have to pay for that as well.
|
|
|
The Following User Says Thank You to You Need a Thneed For This Useful Post:
|
|
01-30-2015, 08:18 AM
|
#93
|
Powerplay Quarterback
Join Date: Oct 2012
Location: Calgary
|
Quote:
Originally Posted by SebC
But without the process, you don't get the Peace Bridge. You get boring.
|
I disagree. Using the right process still could have gotten you a world class bridge.
|
|
|
01-30-2015, 08:43 AM
|
#94
|
Franchise Player
|
Quote:
Originally Posted by MrMastodonFarm
Why wouldn't they be allowed?
|
All municipalities in Alberta are required to go through a competitive bid process for any services contract over $75,000.
http://www.tilma.ca/government_procurement.asp
Construction started in March 2010, though, so potentially the design contract was issued prior to April 2009, which is when TILMA came into effect for municipalities (although we were abiding by the guidelines prior to that). So if the contract was sourced prior to April 2009 the City would have violated their own internal guidelines by sole-sourcing, but would not have gone against TILMA. If that's the case I can understand how it was allowed.
|
|
|
The Following User Says Thank You to V For This Useful Post:
|
|
01-30-2015, 08:59 AM
|
#95
|
Franchise Player
Join Date: Jul 2003
Location: In my office, at the Ministry of Awesome!
|
Quote:
Originally Posted by rotten42
I disagree. Using the right process still could have gotten you a world class bridge.
|
The St. Patrick's Island bridge would seem to indicate otherwise.
It's a nice enough bridge, but some of the other options were IMO a lot nicer, and it certainly doesnt' stand up to the Peace Bridge.
__________________
THE SHANTZ WILL RISE AGAIN.
 <-----Check the Badge bitches. You want some Awesome, you come to me!
|
|
|
01-30-2015, 09:37 AM
|
#96
|
Franchise Player
Join Date: Mar 2002
Location: Auckland, NZ
|
Quote:
Originally Posted by FlameOn
So all controversy aside, how are they going to fix this? And for anyone writing contracts like these, what kind of penalties are there for the contractor for screwing up royally like this?
|
It wasn't the contractor, it was the design engineer that screwed up. The contractor built it to the drawings they have to work with.
As for the schedule, I don't think it's over its original completion date. I think it's actually on schedule for completion of early next month.
|
|
|
01-30-2015, 09:45 AM
|
#97
|
Franchise Player
Join Date: Jul 2005
Location: Calgary
|
Quote:
Originally Posted by Muta
It wasn't the contractor, it was the design engineer that screwed up. The contractor built it to the drawings they have to work with.
As for the schedule, I don't think it's over its original completion date. I think it's actually on schedule for completion of early next month.
|
Except the sign by the side of the road says 2014....
__________________
Quote:
Originally Posted by Grimbl420
I can wash my penis without taking my pants off.
|
Quote:
Originally Posted by Moneyhands23
If edmonton wins the cup in the next decade I will buy everyone on CP a bottle of vodka.
|
|
|
|
01-30-2015, 09:49 AM
|
#98
|
Franchise Player
Join Date: Mar 2002
Location: Auckland, NZ
|
Quote:
Originally Posted by FireFly
Except the sign by the side of the road says 2014....
|
Yeah well, they may have been an early estimated time, but that may not be what the contract with stated.
|
|
|
01-30-2015, 11:47 AM
|
#99
|
Franchise Player
Join Date: Oct 2001
Location: NYYC
|
Quote:
Originally Posted by Erick Estrada
The majority of Calgarians didn't want the bridge originally. City hall went ahead against the majority which you can understand would equate to some unhappy people.
|
You know what? Screw the majority. The majority of people are uninformed, uneducated and just plain ignorant about 95% of the issues that are out there.
Personally, I consider myself an expert on very few things. I can give you a professional opinion on most Graphic Design/Illustration/Branding related things, so you should absolutely listen to me there. I'm interested in architecture, cars, photography, hockey, and watches, so I can give you solid hobby-level thoughts on those things (but you should probably get a second opinion). Anything else, I'm not to be trusted. Don't asks me how to run a hospital, how to drill an oil well, or how to build a house.
The vast majority of Calgarians know nothing about good architecture/design and the engineering of a bridge...so why is it that important that every angry citizen out there be listened to? We all have our specialities, and things run best when they are done by people who know what they are doing. At your job, do things function better when the right people are allowed to do their job, or when everyone and their mom is involved? The more people you ask to be involved in a decision, the more average the outcomes tend to be. And when you want to beautify your city with new architecture, average won't cut it. There are no original ideas by committee.
We elect leaders to lead. Let them do their job. They don't need to run everything by the collective opinion. If you don't like what they are doing, feel free to vote otherwise at the next election.
|
|
|
The Following 51 Users Say Thank You to Table 5 For This Useful Post:
|
4X4,
Addick,
Antithesis,
Ben_in_Canada,
Biff,
Bigtime,
Bobblehead,
Boblobla,
Bunk,
Burninator,
cam_wmh,
chalms04,
CliffFletcher,
corporatejay,
Dan02,
DownInFlames,
firebug,
FlameOn,
getbak,
I-Hate-Hulse,
InglewoodFan,
Ironhorse,
jammies,
jayswin,
Joborule,
ken0042,
Locke,
Looch City,
Mazrim,
Mccree,
Montana Moe,
MRCboicgy,
mrkajz44,
MrMastodonFarm,
Muta,
Peanut,
Red Ice Player,
Rhettzky,
RougeUnderoos,
rubecube,
SebC,
Slava,
surferguy,
The Yen Man,
topfiverecords,
Tyler,
V,
Vulcan,
WhiteTiger,
woob,
You Need a Thneed
|
01-30-2015, 02:37 PM
|
#100
|
Lifetime Suspension
|
Ouch, how's your butthole, EE.
|
|
|
The Following User Says Thank You to MrMastodonFarm For This Useful Post:
|
|