I threw it out on twitter, the replies are that administration said 4th St has no connectivity because it ends at the Stampede grounds. Yes, but it would connect to the freaking 12th Avenue section of the track, and guess what? You are building a community around 4th that is hoping to house something like 10,000 people. Maybe we should put the lane in now instead of fighting an epic battle later to get it in place (kind of like the airport tunnel but at a ridiculous fraction of the cost).
Edit: Chatting with Druh on twitter now about it, she says the roadway has the allowance built in on 4th to easily accommodate the bike lane and that the CMLC could move on it faster with their own funds. She also agrees it would be best to get the bike lane in place sooner rather than later, as EV will have residents much sooner than they were expecting.
Last edited by Bigtime; 04-30-2014 at 07:44 AM.
|