Calgarypuck Forums - The Unofficial Calgary Flames Fan Community

Go Back   Calgarypuck Forums - The Unofficial Calgary Flames Fan Community > Main Forums > The Off Topic Forum
Register Forum Rules FAQ Community Calendar Today's Posts Search

Reply
 
Thread Tools Search this Thread
Old 02-15-2007, 07:33 PM   #41
mykalberta
Franchise Player
 
mykalberta's Avatar
 
Join Date: Aug 2005
Location: Calgary
Exp:
Default

Quote:
Originally Posted by Bobblehead View Post
I know there was talk of dropping Barlow into a tunnel, but that was going to be costly. The Metis Trail interchange should be finished in early summer, and it appears to be a dual lane flyover from eastbound McKnight to Northbound Metis Trail so that will accomodate a lot of traffic.

The new C-Train station (Westwinds) and maintenance yards are under construction (tracks are 90% laid, they appear to be waiting for the flyover to finish so they can cross what is the current McKnight without fouling up traffic). The most recent plans are for the C-Train to go towards 80th then swing east to Saddleridge Circle, but I agree a swing into the Airport would make sense.

The airport did/does, but they have allowed a bunch of development and were actually talking about a golf course wedged in there. I''d guess the runways in your map are still accurate, the the Barlow re-alignment doesn't seem to fit with what has been built in the last 3 years (a lot!)

Throwing this derailment back on the tracks, this shows Airport trail east swinging down to join the ring road. I wonder why they would do that?
Barlow is being shifted to the east as per the airports plan - they already own the land. Airport trail is scheduled to go underground uf the new runway - thats all.

Click on the 20 year master plan (pdf):

http://www.calgaryairport.com/document.cfm?did=850

I have attached a screen shot since its a 15mb download and really slow (its a really good read if you are an airlines nerd as I am:



Here is the proposed C Train connection (at present city has no plan but airport as usual is ready when the city gets off their collective buts):



Here is the proposed connection to a possible/future high speed commuter train:



I must say, the Calgary aiport is probably the most well run and planned semi-governmental agencies this city has. Heck we should fire all members of city council and let the airport managers run the damn city.

MYK

Last edited by mykalberta; 02-15-2007 at 07:39 PM.
mykalberta is offline   Reply With Quote
Old 02-23-2007, 10:42 AM   #43
MacDougalbry
Lifetime Suspension
 
Join Date: Mar 2006
Exp:
Default

Does anyone know if there are dates attached for the extension of Stoney Trail from Glenmore to 16. Ave. SW/Hwy1?
MacDougalbry is offline   Reply With Quote
Old 02-23-2007, 11:22 AM   #44
Bill Bumface
My face is a bum!
 
Bill Bumface's Avatar
 
Join Date: Feb 2003
Exp:
Default

I'm confused... I thought the interchange at Stoney and Deerfoot was designed as a T because it was going to be a while until the NE leg was finished. Is that out the window now?

The Glenmore to Hwy 1 section will be a long ways off as the interchange they are 80% done at Stoney and 16th is a T for sure. No sign of running the road up the hill yet.
Bill Bumface is online now   Reply With Quote
Reply


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -6. The time now is 10:17 AM.

Calgary Flames
2024-25




Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright Calgarypuck 2021 | See Our Privacy Policy