Quote:
Originally Posted by GGG
I think the railing is there because when you go later to do inspections you would need fall protection if there wasn’t railing present. Seems like an easy thing to do.
As for timing I would suspect it has something to do with soil settlement and fill because they are doing all of them or it was just missed in the original design and needed to get engineered post install.
|
2 months later.... railings still being "worked on".
Appears to be a crew of 2 poor schmucks going overpass by overpass while leaving the construction signage and lower speed signs up at every overpass in the entire south end of Stoney.
Amazing how incompetent road construction can be here.
Will it carry into 2026?