12-18-2024, 05:39 PM
|
#4201
|
Franchise Player
Join Date: Mar 2015
Location: Pickle Jar Lake
|
Quote:
Originally Posted by Joborule
|
Interesting when you get to the "indirect risks" section. "REDACTED".
|
|
|
The Following 3 Users Say Thank You to Fuzz For This Useful Post:
|
|
12-18-2024, 05:40 PM
|
#4202
|
Franchise Player
Join Date: Feb 2006
Location: Calgary, AB
|
Quote:
Originally Posted by Mazrim
I thought the report was labeled confidential by the provincial government to avoid "influencing construction costs"?
|
It was, but everyone called them on their BS for that. There are multiple pages that are redacted. Presumably, that was the problem info.
__________________
Turn up the good, turn down the suck!
|
|
|
12-18-2024, 05:46 PM
|
#4203
|
Franchise Player
Join Date: Feb 2011
Location: Somewhere down the crazy river.
|
Quote:
Originally Posted by Jimmy Stang
|
This failure falls squarely at the feet on Sean Chu. Had this been originally conceived as North Central line, the value to neighbourhoods and riders would have been immediately recognized and I think proceeded with a bit more expediency.
|
|
|
The Following 7 Users Say Thank You to Wormius For This Useful Post:
|
|
12-18-2024, 05:47 PM
|
#4204
|
Looooooooooooooch
|
They probably redacted the page that had "and therefore we recommend the tunnel" in big bold letters.
|
|
|
The Following 8 Users Say Thank You to Looch City For This Useful Post:
|
|
12-18-2024, 05:48 PM
|
#4205
|
Franchise Player
Join Date: Feb 2010
Location: Park Hyatt Tokyo
|
What is this a LRT document for ants? Anyone else's locked on 5% zoom rate?
|
|
|
12-18-2024, 05:49 PM
|
#4206
|
Franchise Player
Join Date: Mar 2015
Location: Pickle Jar Lake
|
Quote:
Originally Posted by topfiverecords
What is this a LRT document for ants? Anyone else's locked on 5% zoom rate?
|
Nope,mine is fine. Gonna blame this on user error.
|
|
|
12-18-2024, 05:54 PM
|
#4207
|
Franchise Player
Join Date: Feb 2006
Location: Calgary, AB
|
It opens at 5% for me, but I can zoom it in to 100% fine.
__________________
Turn up the good, turn down the suck!
|
|
|
The Following User Says Thank You to getbak For This Useful Post:
|
|
12-18-2024, 05:56 PM
|
#4208
|
Powerplay Quarterback
|
Quote:
Originally Posted by Wormius
This failure falls squarely at the feet on Sean Chu. Had this been originally conceived as North Central line, the value to neighbourhoods and riders would have been immediately recognized and I think proceeded with a bit more expediency.
|
The need for LRT for NC Calgary has been known and enumerated for decades.But the planners have continued to ignore it except to use NC ridership to advocate for skipping BRT for the SE.
if you swapped Keating for Chu the results would have been the same because the GL would have still have picked Shepard for the maintenance yard by 2015.
|
|
|
The Following 2 Users Say Thank You to accord1999 For This Useful Post:
|
|
12-18-2024, 06:10 PM
|
#4209
|
Franchise Player
Join Date: Aug 2008
Location: California
|
Quote:
Originally Posted by Mazrim
I thought the report was labeled confidential by the provincial government to avoid "influencing construction costs"?
|
The construction cost info is redacted.
So to answer the question of how did the UCP get the alignment it wanted it appears they just didn’t include a comparison to the below ground option wasn’t in the scope of this document as the old proposal does not seem to be mentioned anywhere.
|
|
|
12-18-2024, 07:15 PM
|
#4210
|
First Line Centre
Join Date: Dec 2013
Location: Calgary, Canada
|
Build the line the proper way with the tunnel but trim down on some of the more cost heavy parts of the stations and simplify. Design them for reduced operating expenses going forward and keep them simple. You can always upgrade if need be but your not going to be building more tunnels in 20 years most likely.
The City and the Province need to both stop playing games and get on with this nonsense but in the meantime the need for this project does not stop. Build what is the best option and then hammer the feds and the province for more money all the time. We will have a new Conservative government in power in Ottawa most likely soon and they should be friendly to Calgary. The province can't continue to ignore the needs of the largest city for transportation forever. Do it right and be pragmatic about it.
|
|
|
12-18-2024, 07:24 PM
|
#4211
|
Franchise Player
Join Date: Mar 2007
Location: Income Tax Central
|
https://www.cbc.ca/news/canada/calga...ices-1.7412807
Oh man, the residents who lost their homes are distinctly unhappy. The Eau Claire residents for one, but right across from my office there used to be 3 duplexes that were leveled...now seemingly for nothing.
'Boondoggle' doesn't seem like a strong enough term.
__________________
The Beatings Shall Continue Until Morale Improves!
This Post Has Been Distilled for the Eradication of Seemingly Incurable Sadness.
The World Ends when you're dead. Until then, you've got more punishment in store. - Flames Fans
If you thought this season would have a happy ending, you haven't been paying attention.
|
|
|
12-18-2024, 09:49 PM
|
#4212
|
Franchise Player
|
Quote:
Originally Posted by curves2000
Build the line the proper way with the tunnel but trim down on some of the more cost heavy parts of the stations and simplify. Design them for reduced operating expenses going forward and keep them simple. You can always upgrade if need be but your not going to be building more tunnels in 20 years most likely.
The City and the Province need to both stop playing games and get on with this nonsense but in the meantime the need for this project does not stop. Build what is the best option and then hammer the feds and the province for more money all the time. We will have a new Conservative government in power in Ottawa most likely soon and they should be friendly to Calgary. The province can't continue to ignore the needs of the largest city for transportation forever. Do it right and be pragmatic about it.
|
I have my doubts public transit will be a priority for a federal Conservative gov't.
|
|
|
The Following 2 Users Say Thank You to D as in David For This Useful Post:
|
|
12-19-2024, 07:55 AM
|
#4213
|
Franchise Player
|
Quote:
Originally Posted by D as in David
I have my doubts public transit will be a priority for a federal Conservative gov't.
|
Me too. Which is why I don't think it's a good idea to build a project that is so dependent on future extensions to actually be useful (which is true of both the city and prov proposals)
__________________
CP's 15th Most Annoying Poster! (who wasn't too cowardly to enter that super duper serious competition)
|
|
|
12-19-2024, 08:23 AM
|
#4215
|
Franchise Player
|
Quote:
Originally Posted by powderjunkie
Me too. Which is why I don't think it's a good idea to build a project that is so dependent on future extensions to actually be useful (which is true of both the city and prov proposals)
|
It's too bad there isn't a public transit project they could build that didn't require a tunnel and where even the first stations went through a densely populated corridor that already has high transit use. Because that would be perfect.
|
|
|
The Following User Says Thank You to bizaro86 For This Useful Post:
|
|
12-19-2024, 09:01 AM
|
#4216
|
Franchise Player
Join Date: Feb 2011
Location: Somewhere down the crazy river.
|
Calgary Public Transit - Discussion
Quote:
Originally Posted by PepsiFree
This is probably dumb but I don’t entirely understand why they don’t just reveal their grand master plan for the train lines and then just chip away at it station by station starting from downtown outwards. Even if they’re only completely 1-2 stations every 1-2 years, wouldn’t that be easier?
|
Isn’t a turn-around (or whatever the term is) needed at the end of each line? I think the cost of building them, tearing them down again, rebuilding, would be costly. Not to mention, perpetual construction along Centre St., and you know how drivers get when construction slows down their commutes.
I have to give some kudos to places where when they want a new train line to be built, they just say “f it” to everybody and build it and not worry about infinite consultations with everyone and the squirrels.
Last edited by Wormius; 12-19-2024 at 09:04 AM.
|
|
|
The Following User Says Thank You to Wormius For This Useful Post:
|
|
12-19-2024, 09:06 AM
|
#4217
|
Powerplay Quarterback
|
Quote:
Originally Posted by D as in David
I have my doubts public transit will be a priority for a federal Conservative gov't.
|
Outside of some major infrastructure projects, Alberta conservative governments have never been very supportive of transit.
For example, Alberta Transportation no longer has anyone on staff with transit expertise. Transit is not an Alberta priority
|
|
|
The Following 2 Users Say Thank You to para transit fellow For This Useful Post:
|
|
12-19-2024, 09:14 AM
|
#4218
|
Franchise Player
Join Date: Aug 2009
Location: wearing raccoons for boots
|
The City having to deal with ucp on basically anything is what I imagine its like having to deal with trump on anything. No expertise, just going on whims, flawed ideology and a desire to reward their donors.
|
|
|
The Following 2 Users Say Thank You to puffnstuff For This Useful Post:
|
|
12-19-2024, 09:18 AM
|
#4219
|
Scoring Winger
|
Quote:
Originally Posted by PepsiFree
This is probably dumb but I don’t entirely understand why they don’t just reveal their grand master plan for the train lines and then just chip away at it station by station starting from downtown outwards. Even if they’re only completely 1-2 stations every 1-2 years, wouldn’t that be easier?
|
Well first you have to start with where to store / manage the trains... so the first station would not / cannot be downtown.
Having a train that connects only Sheppard to Quarry Park might benefit... 1000 people? of which only 10 percent would use it?
Then you have to factor in that when you don't have plans solidified, as we have seen, any new person getting involved changes things dramatically. You have someone new come in, spend time and wages learning your design, deciding they don't agree and spend more time and wages re-designing. Then you also, as you've seen, forego all the lessons learned to make new mistakes that were already previously avoided.
Further to that, trying to build in stages puts you at the threat of supply issues and other interfacing issues. For example, a manufacturer no longer makes the type of track you want in mass quantities, so you're forced to pay custom order fees.
|
|
|
The Following User Says Thank You to jwslam For This Useful Post:
|
|
12-19-2024, 09:24 AM
|
#4220
|
tromboner
Join Date: Mar 2006
Location: where the lattes are
|
Quote:
Originally Posted by jwslam
Further to that, trying to build in stages puts you at the threat of supply issues and other interfacing issues. For example, a manufacturer no longer makes the type of track you want in mass quantities, so you're forced to pay custom order fees.
|
Is this a real issue, or a hypothetical one? I would've assumed train track is pretty standardized.
|
|
|
Thread Tools |
Search this Thread |
|
|
Posting Rules
|
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts
HTML code is Off
|
|
|
All times are GMT -6. The time now is 04:06 AM.
|
|