01-28-2015, 01:31 PM
|
#21
|
First Line Centre
|
It's only a $6MM bridge so not big deal. (spend $25MM and you may get some public attention).
|
|
|
01-28-2015, 01:42 PM
|
#22
|
Franchise Player
Join Date: Oct 2006
Location: San Fernando Valley
|
How was the welding?
|
|
|
01-28-2015, 01:43 PM
|
#23
|
Lifetime Suspension
|
Quote:
Originally Posted by Erick Estrada
How was the welding?
|
It's the measuring tape we need to address.
|
|
|
01-28-2015, 01:49 PM
|
#24
|
Powerplay Quarterback
|
Having been part of the odd "oh sh*t!" moment in my time, my sympathies go out to some poor engineer who is having a pretty bad day today.
|
|
|
01-28-2015, 01:57 PM
|
#25
|
Franchise Player
Join Date: Oct 2006
Location: San Fernando Valley
|
Would be nice to know the magnitude of the error here. 1 foot, 5 feet, etc.
|
|
|
The Following User Says Thank You to Erick Estrada For This Useful Post:
|
|
01-28-2015, 01:58 PM
|
#26
|
Franchise Player
Join Date: Oct 2006
Location: San Fernando Valley
|
Quote:
Originally Posted by InglewoodFan
Having been part of the odd "oh sh*t!" moment in my time, my sympathies go out to some poor engineer who is having a pretty bad day today.
|
In a project such as this there's surely more than one person to point the finger.
|
|
|
01-28-2015, 01:59 PM
|
#27
|
Franchise Player
Join Date: Jan 2010
Location: Calgary
|
I doubt it's the engineer. This is on someone who was supposed to check the routing with Transportation; usually, this task is on a transportation contractor or, likely, on a clerk at the tracking company...
__________________
"An idea is always a generalization, and generalization is a property of thinking. To generalize means to think." Georg Hegel
“To generalize is to be an idiot.” William Blake
|
|
|
01-28-2015, 02:00 PM
|
#28
|
Franchise Player
Join Date: Dec 2010
Location: Calgary
|
Quote:
Originally Posted by Iggy City
Spenshi does it again!
|
He's just always up to something, isn't he??!!
|
|
|
The Following 28 Users Say Thank You to JonDuke For This Useful Post:
|
agulati,
Antithesis,
Art Vandelay,
Ben_in_Canada,
BsFaninCGY,
Bunk,
cam_wmh,
Circa89,
corporatejay,
Dan02,
DropIt,
flamesfan1297,
flamingreen,
Flash Walken,
Hugh Jahrmes,
jammies,
jayswin,
Looch City,
para transit fellow,
Peanut,
redflamesfan08,
Scornfire,
Sr. Mints,
Superfraggle,
Swift,
Thor,
undercoverbrother,
woob
|
01-28-2015, 02:28 PM
|
#29
|
Powerplay Quarterback
|
I’d be willing to bet that this is a span/abutment interface issue with mounting points not lining up, rather than the bridge span itself being 10-12cm +/-. If it’s an interface issue, it will fall to PCL and their fabricator to fight over money. If the bridge is actually the wrong length and matches the latest rev of approved drawings, then it will be PCL and the city fighting about it.
Hopefully it’s a mounting issue and not an overall length issue. Fixing mount points could be as easy as coring new anchor bolts.
|
|
|
01-28-2015, 02:44 PM
|
#30
|
Scoring Winger
|
Somebody messed up but this stuff happens all the time, though usually on a smaller scale. Heck just a couple weeks ago we upgraded a major part of our plant with a new part from the oem manufacturer and even a consultant to help us. A major peice for whatever reason wasn't even close to fitting and required some major modifying to make it work. Haha still funny.
|
|
|
01-28-2015, 02:54 PM
|
#31
|
Franchise Player
Join Date: Mar 2007
Location: Calgary
|
Wish the Stampede would open that bridge behind the dome before June. It's finished, just needs paving on the far side of the river.
|
|
|
The Following User Says Thank You to burn_this_city For This Useful Post:
|
|
01-28-2015, 02:54 PM
|
#32
|
Franchise Player
Join Date: Oct 2006
Location: San Fernando Valley
|
Quote:
Originally Posted by JonDuke
He's just always up to something, isn't he??!!

|
The "greatest" average mayor there ever was.
|
|
|
01-28-2015, 03:02 PM
|
#33
|
Franchise Player
Join Date: Dec 2012
Location: On your last nerve...:D
|
Quote:
Originally Posted by llwhiteoutll
Hopefully it’s a mounting issue and not an overall length issue.
|
|
|
|
The Following 4 Users Say Thank You to Minnie For This Useful Post:
|
|
01-28-2015, 03:06 PM
|
#34
|
First Line Centre
Join Date: Jul 2013
Location: Calgary
|
classic mix up
|
|
|
The Following User Says Thank You to shogged For This Useful Post:
|
|
01-28-2015, 03:09 PM
|
#35
|
Franchise Player
Join Date: Aug 2007
Location: Vancouver
|
I live right behind Crappy Tire there, and I've been wondering why it hasn't been completed. It looks like it's been ready for a while.
I'm excited for it to finish, it looks cool.
__________________
|
|
|
01-28-2015, 03:15 PM
|
#37
|
Powerplay Quarterback
Join Date: Sep 2010
Location: Calgary, AB
|
I don't understand why the city doesn't just do the Calatrava Bridge for every single overpass they build. They paid for the design. Imagine, red finger trap bridges everywhere.
|
|
|
The Following 3 Users Say Thank You to billybob123 For This Useful Post:
|
|
01-28-2015, 03:17 PM
|
#38
|
Franchise Player
|
Quote:
Originally Posted by Dynamic
Somebody messed up but this stuff happens all the time, though usually on a smaller scale. Heck just a couple weeks ago we upgraded a major part of our plant with a new part from the oem manufacturer and even a consultant to help us. A major peice for whatever reason wasn't even close to fitting and required some major modifying to make it work. Haha still funny.
|
Woah - hang on. Are you suggesting this kind of thing happens in the private sector? Because I find that hard to believe.
__________________
Quote:
Originally Posted by fotze
If this day gets you riled up, you obviously aren't numb to the disappointment yet to be a real fan.
|
|
|
|
01-28-2015, 03:51 PM
|
#39
|
CP Gamemaster
Join Date: Feb 2010
Location: The Gary
|
Quote:
Originally Posted by CliffFletcher
Woah - hang on. Are you suggesting this kind of thing happens in the private sector? Because I find that hard to believe.
|
It's impossible. The private sector is perfect.
(On a more honest note, I have some not great memories of finger pointing on problems with contractors on most jobs I've worked on, some more noticeable to the public than others!)
|
|
|
01-28-2015, 04:21 PM
|
#40
|
Voted for Kodos
|
Must have been a slow news day.
The construction nusiness is a constant battle to make things fit that don't fit.
In this case, very likely a surveying issue, or a measurement issue. The steel arch likely had to be ordered before a site measurement could be taken.
The fix is likely chipping some bearing plates out, moving them, and casting them back in. The big cost is the cost of moving the crane in a second time.
Shouldn't have anything to do with the city.
|
|
|
The Following User Says Thank You to You Need a Thneed For This Useful Post:
|
|
Thread Tools |
Search this Thread |
|
|
Posting Rules
|
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts
HTML code is Off
|
|
|
All times are GMT -6. The time now is 04:18 PM.
|
|