What are you doing for returns on the skylights?
I only say to resheet because of the volume of joints and locations. Why you would put seams two inches from the edge is beyond me. Of those sheets had been main vertically you would have one nice joint every 4 feet, either between each light or half way through them. You’d never see them after. With End sheet butt joints everywhere your mudder will have a hard time hiding them all. Not saying it can’t be done but there’s easier ways and with time a jigsaw puzzle like that will probably show through. Too many people try to save a couple sheets of drywall by patching all the scraps together when a couple extra sheets would cut the joints in half.
As for gaps those aren’t terrible to manage, even the top joint you’re worried about. There are quick set compounds and full compound that dry much harder than the finishing mud you get in a bucket. I’ve even used quickset concrete mix to fill gaps before taping.
With texture it’s probably gonna be fine, I just wold have done it different. But I’m still learning after 4 complete Home Reno’s. I’m not a tradesman.
|