Plumbing question.

My basement bathroom is finished with a toilet and sink. The taps and shower head for a shower wee installed the shower pan and drain piping to the rough in were not.

A few questions

1) If I install a shower do I need a permit to install the P-trap and connect the pan to the roughed in drain.
2) id rather install a bath tub. Can you use a shower spaced rough in and go overflow into a 90 to a Tee which has the drain which then flows into the ptrap and rough in. Essentially the rough in is located 12-14" from the wall whereas the tub needs 4" from the wall. Is there a way to do this to code without busting out concrete and moving the rough in