I'm just in the process of building with them. Are those plans within a few days of you putting in the offer to purchase? If so, by the time I was done all my appointments with the Design Studio I must have made about a dozen changes to the drawings for things like electrical, data, gas lines, extra plumbing (including sink in the garage), moving central vac to garage, etc.
|