Quote:
Originally Posted by DoubleK
Isn't that overpass only a few years old?
|
It was designed to be a temporary overpass to bridge the gap between needing the traffic alleviated at Glenmore/37th and the Ring Road project getting done. IIRC to save costs it was designed and built with a 30 year lifespan or so, which is pretty darn short for overpass projects.
EDIT: for anyone interested, he was a presentation on it.
https://www.ucalgary.ca/EN/Civil/csc...ation_CSCE.pdf