View Single Post
Old 03-07-2016, 10:38 AM   #55
getbak
Franchise Player
 
getbak's Avatar
 
Join Date: Feb 2006
Location: Calgary, AB
Exp:
Default

I suspect the chess guys were planted there by the producers so that the teams would have to work around them.

I'm curious what the instructions were for that task because it seemed to me that the easiest way to do it would be to figure out how many paper widths fit between two of the concrete supports of the bench and then count the number of supports.


I wonder if the end-of-leg bunch-up was planned or if there were issues with the trains that caused it to happen? It really didn't make sense to have the pit stop in another city if everyone is going to end up getting filtered onto the same train at the end (and they would have all been on that train if the "models" had hustled to catch the train). It basically made everything on the leg up to that point moot and it was just a foot race to the finish line.
__________________
Turn up the good, turn down the suck!
getbak is offline  
The Following User Says Thank You to getbak For This Useful Post: