Quote:
Originally Posted by Bonded
You believe what you but that was totally an excuse to get out of it. CSEC agreed to take on cost overages and material and labour costs went bananas. The mayor was dumb for giving them an out but I think CSEC would have weaseled out of it either way.
Do some research
|
So the city didnt add on additional asks after the deal was signed that was not in the contract?
You make me laugh.