Quote:
Originally Posted by Mazrim
Pardon my confusion on this, but what do the people building the planes have to do with the software certification process?
|
I was thinking that to, but it could be the verification process. I'd imagine every plane needs a full technical rundown before shipping. Perhaps the people doing the verification are also the ones who wrote the software fixes. So they could be the rate determining factor, or they have added a bunch of extra verification that takes longer to run that it does build planes.