View Single Post
Old 01-18-2020, 02:15 PM   #19
Engine09
#1 Goaltender
 
Engine09's Avatar
 
Join Date: Sep 2005
Location: Calgary, AB
Exp:
Default

Quote:
Originally Posted by MillerTime GFG View Post
If this mortgage is due for renewal on or around the effective date of this statement, consider this your instruction to not renew this mortgage, pending payout of it. Should the mortgage have to be renewed, consider this your instruction to renew the mortgage only for a 6 month open term. These instructions are to have priority over any other renewal letter, document or other instrument you may have sent to me/us.
This is the exact wording that I just discovered was on the payout request, which was sent to Scotiabank 7 days before my renewal date. They dragged their ass, waited until 1 day after the renewal date then added on the penanties.

After asking Scotiabank a 2nd time for a DATED copy of the payout request showing when it was received they sent me a copy without a date. I specifically asked for a dated copy stating this detail was most important.

I'm going to get in touch with someone higher up at Scotia, I'm about to lose my temper with the current guy I've been dealing with.

Braeside location on Southland.
Engine09 is offline   Reply With Quote