Quote:
Originally Posted by FacePaint
Price increase was completely the fault of delays caused by the Province. So when you say you're on the side of the Province are you on the side that paused construction for review, then agreed with tunneling. Or the side of the Province that paused construction again for review and forced through a new, crappy plan?
|
The failure was having predetermined that tunnel and south were better and having studies and decision structures designed to pick that option from the start.