View Single Post
Old 10-09-2025, 02:53 PM   #27625
simmer2
Franchise Player
 
simmer2's Avatar
 
Join Date: Aug 2005
Location: Calgary, Alberta
Exp:
Default

Pipeline “under‑capacity” is misleading.

The Trans Mountain Expansion (TMX) is barely a year into operation. Shippers have been testing it steadily—actual throughput always starts below nameplate capacity.

Much of that space is already contracted long‑term; the system is not sitting empty. The ramp‑up and testing phase doesn’t mean Alberta doesn’t need more capacity in the future.

Oil sands production continues to grow modestly every year.

Planning multi‑billion‑dollar pipelines requires looking 10–20 years ahead, not today’s temporary utilization rates.

Re Alberta and free handout. Alberta didn’t get a “free” pipelineTMX was originally a private project that Ottawa bought after political opposition and regulatory gridlock—mostly from B.C.—scared off private investors.The “taxpayer‑funded” part was the result of political interference, not Alberta asking for a handout. Alberta companies still pay tolls and taxes to ship their product like any other customer.Alberta taxpayers also contribute more to federal revenues than any other province—by billions annually—so calling the pipeline “free” ignores fiscal reality.
simmer2 is offline   Reply With Quote