View Single Post
Old 01-08-2025, 01:08 PM   #4309
accord1999
Powerplay Quarterback
 
Join Date: Aug 2010
Exp:
Default

Quote:
Originally Posted by moncton golden flames View Post
I know, I live along the corridor.

I see successful BRTs all over the place and wonder why we are so set on LRT. I know we have a good track record (pardon the pun) but why can't a BRT work for the Green Line?
A "problem" with the Green Line was that in 2015 it got more funding promises than was needed for a BRT, but ultimately nowhere near enough for a LRT that made everyone happy, and now too much political and financial capital has already been spent on rail to easily go back.

Quote:
What about building a solid BRT from Seton to Country Hills with a downtown tunnel. We get the connections we need, the future tunnel for a transition to LRT if we need it. A tunnel will never be cheaper than today.
The tunnel has become so expensive that there isn't enough money leftover for the BRT. Even in 2020, a BRT that didn't require a tunnel or a new bridge over the Bow was already expected to cost $2.2B:

Spoiler!
accord1999 is online now   Reply With Quote