Quote:
Originally Posted by moncton golden flames
Would completing the 8th Avenue tunnel, sinking the red line allow the Green Line to occupy 7th Avenue and move up Centre Street? I know getting the Green Line to 7th might be a challenge, but that seems easier than what is presented now?
|
Quote:
I find it fun to think about possible alignments, and by no means am I educated enough to really know what I'm doing, haha.
|
In 2020, the Green Line released a report on some of the alignment options they looked after issues came up with the river crossing. In those options, if the SE Line linked up with the Red Line, it was not possible to connect it with the NC LRT anymore. Strangely, they also decided to use the 8th Ave tunnel for the SE LRT, rather than the for the far busier Red Line.
https://pub-calgary.escribemeetings....umentId=131775