View Single Post
Old 10-17-2024, 03:24 PM   #4564
powderjunkie
Franchise Player
 
Join Date: Dec 2011
Exp:
Default

Quote:
Originally Posted by Fuzz View Post
So you'd need duplicate maintence facilities built if they ever build the north line? I dunno, none of this makes any long term sense to me. Build it right the first time, FFS. The fact we are re-studying decisions discarded from 2016 and still have nothing built is crazy.
The Lynnwood alignment needed duplicate MSFs in just the SE.

Shepard means higher deadheading costs from the North. Enough to justify a separate MSF? Probably not on its own, but once you start adding a bridge over the Bow River, additional land expropriation (now a largely sunk cost), and the need to dig deep under 8th Ave, etc the math makes a lot more sense.

Separate the lines and the SE can terminate at 8th Ave with a shallow cut +cover underground, or come to surface north of 9th and terminate at 7th
__________________
The UCP are trampling on our rights and freedoms. Donate $200 to Alberta NDP and get $150 back on your taxes
powderjunkie is offline   Reply With Quote