Originally Posted by powderjunkie View Post
Starting from the SE for this stretch, at one time or another the plans for each of these stations have been:

elevated (Ramsay)
underground
underground
underground
underground
underground
underground (16th)


And the target date for the EC to Millican stub approved in July was 2031.
You're right about the Ramsay. Although in 2019-ish, there was talk and some concept renderings (IIRC) about making Inglewood and Ramsay street-integrated stations, but I guess those didn't make it into the Phase 1 plans. Probably because they wanted to get Phase 1 started and didn't want to redesign too much.

Around the same time, the Centre Street concept was and still is (if the current vision is salvaged) intended to be above-ground and street-integrated:

https://calgaryherald.com/news/local...escent-heights

https://engage.calgary.ca/greenline/...rescentheights