I finally got the solar panels installed (was originally scheduled for April, they said delayed due to weather but sorry it wasn't bad weather all summer), now waiting for inspections and the bi-directional meter whatever.
The Greener Homes Loan though has been emailing me saying I need to complete everything by November 1 and it's entirely possible I won't make that date if it takes a few weeks for inspections then 3 weeks for the meter.. so I called them and it looks like they can extend it for me but I have to call within 30 days of the final date.
In case someone else ends up in the same position.
Oh and after talking with a different electrician we're pretty sure the transformer is for the house exhaust fan. They're going to have to come back and move it to below the panel, having it on the side like that is very inconvenient to try and close everything back up.
And they'll have to re-label everything. And they put in a 100A breaker instead of the 120A one I had so they'll have to fix that too.
Not the smoothest experience but as long as things are progressing I'm in no rush; the sun isn't going anywhere.
__________________
Uncertainty is an uncomfortable position.
But certainty is an absurd one.
|