Quote:
Originally Posted by powderjunkie
We could approach 2M with either:
4.5 legs (but maybe it’ll even be a full 5 by then!), only the lowest ridership one being in a tunnel
Or
6 legs. Maybe the green line is elevated or not connected. If necessary there is capital available to tunnel the busiest line
|
I take solace that Elon's hyperlink tunnel is not included in the #ucp alternates.