Quote:
Originally Posted by Fuzz
Gee, it's almost like all these things were considered and discarded. Morons.
|
Confused about the elevated bit from him. Why couldn't the elevation climb start immediately by the Event Centre station? Google Maps distance from Event Centre to 1 ST SW gives 1km. He said you would have to start from 17th Ave S to get the required clearance, which would be the distance of ~650m. And he said he preferred the elevated alignment! So what am I missing? Seems like that should be doable, and I agree with him that it would be the best option even if subway was on the table still based on the cost/value.
How in the world is the UCP gonna figure this out with shorter distance to get to Jim Gray's City Hall?