View Single Post
Old 09-19-2024, 09:32 AM   #4355
You Need a Thneed
Voted for Kodos
 
You Need a Thneed's Avatar
 
Join Date: Dec 2007
Exp:
Default

Quote:
Originally Posted by pepper24 View Post
Green Line LRT was going to cost too much and be way over budget if we wanted everything that was originally planned. $15B like posted above. Way too much and good to see it being cancelled.

Instead...

Extend the south line at Somerset-Bridlewood station east along the south part of the ring road all the way to the deep southeast (McKenzie Towne, Cranston, Auburn Bay etc.) with tons of rapid bus transit from surrounding communities and park and ride at stations.

Extend the NE line from Saddletowne station to airport. Up 60th St NE then west on Aiport Trail. Hopefully no issues with Airport tunnel and if tunnel was built without considering LRT expansion then that's just bad city planning.

For North Central. Increase bus capacity into downtown along Center Street and add more car pool/bus lanes.

Get back to 4 cars for each LRT, not sure why I only see 3 cars and full LRTs.
Airport Trail tunnel was built with room for LRT.

We don't have enough LRVs for 4 car trains for most trains. Need another $400 million or so in LRVs to be able to do that.
__________________
My LinkedIn Profile.
You Need a Thneed is offline   Reply With Quote