View Single Post
Old 09-18-2024, 03:49 PM   #4331
Fuzz
Franchise Player
 
Fuzz's Avatar
 
Join Date: Mar 2015
Location: Pickle Jar Lake
Exp:
Default

Quote:
Originally Posted by pepper24 View Post
Green Line LRT was going to cost too much and be way over budget if we wanted everything that was originally planned. $15B like posted above. Way too much and good to see it being cancelled.

Instead...

Extend the south line at Somerset-Bridlewood station east along the south part of the ring road all the way to the deep southeast (McKenzie Towne, Cranston, Auburn Bay etc.) with tons of rapid bus transit from surrounding communities and park and ride at stations.

Extend the NE line from Saddletowne station to airport. Up 60th St NE then west on Aiport Trail. Hopefully no issues with Airport tunnel and if tunnel was built without considering LRT expansion then that's just bad city planning.

For North Central. Increase bus capacity into downtown along Center Street and add more car pool/bus lanes.

Get back to 4 cars for each LRT, not sure why I only see 3 cars and full LRTs.
It's already pretty much maxed out, from previous studies. If only their were a next step to move to...
Fuzz is offline   Reply With Quote