Quote:
Originally Posted by GGG
But why bother running down 7th. Just end the train and don’t cross 7th.
The original C-Train line was built on not being perfect and expanding the network. I think the focus on tunnelling downtown over playing track was a mistake.
|
You need space for the tails/switches at the terminus (my terminology might be wrong). Not sure how that was going to work at Eau Claire now that I think about it, but obviously it’s possible)
The problem is they need to go under Macleod Trails, and then deep under 8th because that will eventually have a tunnel extended from the portion never used)