View Single Post
Old 09-04-2024, 12:21 AM   #4014
powderjunkie
Franchise Player
 
Join Date: Dec 2011
Exp:
Default

Quote:
Originally Posted by GGG View Post
But why bother running down 7th. Just end the train and don’t cross 7th.

The original C-Train line was built on not being perfect and expanding the network. I think the focus on tunnelling downtown over playing track was a mistake.

You need space for the tails/switches at the terminus (my terminology might be wrong). Not sure how that was going to work at Eau Claire now that I think about it, but obviously it’s possible)

The problem is they need to go under Macleod Trails, and then deep under 8th because that will eventually have a tunnel extended from the portion never used)
__________________
The UCP are trampling on our rights and freedoms. Donate $200 to Alberta NDP and get $150 back on your taxes
powderjunkie is offline   Reply With Quote