View Single Post
Old 07-23-2024, 08:27 AM   #862
rohara66
First Line Centre
 
rohara66's Avatar
 
Join Date: Oct 2008
Exp:
Default

Quote:
Originally Posted by topfiverecords View Post
DP drawings can be downloaded here: https://dmap.calgary.ca/?find=DP2024-05327

Materials are as follows.
At street level: Natural stone veneer (split face in some areas and honed in others), curtain wall storefront glazing, solid phenolic wood grain clad columns with stone base
The ice: Aluminum composite metal panel bone white (matte, satin and gloss depending on the region)
The space between ice and fire: Profiled metal panel in charcoal
The fire: Aluminum composite panel silver metallic, aluminum extrusion silver reflective curved or straight [the fins]
Parkade: Perforated metal panel with custom graphics

Plans look cool.


But why couldn't they have the washrooms with an entry door and a separate exit door. Maybe there are so many other washrooms it doesn't matter but this seems like such an easy fix to get people in and out much more efficiently.
rohara66 is offline   Reply With Quote