Quote:
Originally Posted by BlackArcher101
They very well could be thinking that doing their two recent shutdown tests of this line, in preparation for a December 2024 shutdown to do an inspection, may have caused premature failure of the wires. Doing that all again with 5 known weak spots could very well result in another unplanned shutdown and restart of the entire process, wasting time.
|
What is a shut down test? I assume you can’t pressure test these lines.