View Single Post
Old 06-10-2024, 10:49 AM   #393
fotze2
electric boogaloo
 
Join Date: Mar 2023
Exp:
Default

I don’t think twinning a pipe like that’s an easy fix. You’d need to acquire ROW like a mother. Something that big in the bald ass prairie would be a big project.middle of inner city Calgary, I’m not envious of having to deal with that. Maybe running to failure is cheaper than proactively twinning or looping or whatever. It’s possible, just curious.

I choose to run to failure all the time. Like my POS oldass car.

I’m not blame gaming just insanely curious, I had a 20” fail last year due to slope instability. 50 years is a long life. Not every parson on earth is equally partisan. It’s a risk game, no one wants Cadillac infrastructure and the costs.

This isn’t gondeks fault, like she’s making these decisions. That would be ridiculous. It will be on the radar now.

Also, this size, equipment or valves or splices or whatever aren’t sitting in a shelf. A simple bonnet on a wellhead takes me months to source. 7 days would be impressive.

Last edited by fotze2; 06-10-2024 at 10:52 AM.
fotze2 is offline   Reply With Quote
The Following 7 Users Say Thank You to fotze2 For This Useful Post: