Quote:
Originally Posted by calgarygeologist
Now that the West ring road is done and the bridge over the Bow is done does anyone know if there are any plans to eliminate the 80 km/h zone south of Nose Hill Drive?
|
They need to build up the pavement to the level of the bridge deck, as there is a "bump" there currently. I saw someone damage their trailer there. I had expected they would be working on it this spring, but maybe they decided the 80 zone was the permanent fix?