Quote:
Originally Posted by SeeGeeWhy
That project stopped because AESO could not wrap it's head around how to maintain uptime in the event the system lost 1.1GWe due to a trip event or whatever reason. They asked if the capacity could be built in smaller bites, but AECL was not in the business of selling it's smaller capacity designs at the time, so it all went away.
|
You seem to imply that the AESO was acting poorly. Is that what you intended?