Typical Calgary/Alberta infrastrucutre building strategy - they have years/decades to plan and design, and at the end building a less than adequate product to save a few bucks. I would think if it was a dual-lane loop at the get go it would cost maybe an extra $3 mil, now if they want to twin the loop, it probably will cost $30+ mil
|