Firefly showed up at our place this week and gave us a proposal, does anyone know if you can haggle these guys down?
I looked up the equipment cost and it's roughly 1/3 of the total installed cost. I realize people are looking at this as free money borrowed at 0%, but what kind of margins are these outfits making on these?
I don't believe the cabling and conduit is more than a couple thousand, so it leave approximately 15k for labour, engineering, and inspections.
|