Honestly, ATCO is rich. They should find a way to make it playable during that time; put a modular/temporary bubble over the entire pitch, encompassing the field, the south and east structures, and the north grass. Design it in a way that it can be set up and taken down repeatedly. It's ambitious, but not impossible. I recommend my firm to lead this feasibility study / design / construction project.