View Single Post
Old 05-11-2007, 11:22 PM   #8
ken0042
Playboy Mansion Poolboy
 
ken0042's Avatar
 
Join Date: Apr 2004
Location: Close enough to make a beer run during a TV timeout
Exp:
Default

That's some good advice Stranger! Thanks.

I was considering two doors, but I was talked out of it. Now that the front concrete is set with an 18' opening; I think it may be too late. And I was thinking electric heat, so radiant is an option. My ceiling will be just under 10 feet.

As for the floor drain, once again a plumber friend talked me out of it. The floor gets poured in 2 weeks, so it's still an option. Being a detached garage there isn't an option to tie it into the sewer. I was thinking of running a drain out into the lane for snow meltage. But you figure that's an idea? My thinking was worst case scenario is if it does freeze; I'm just back to the same place I would have been with no drain.
ken0042 is offline   Reply With Quote